Fee-charging Standards for Regulatory Services Under the Nuclear Reactor Facilities Regulation Act Article 5
The annual construction inspection fee for each unit of nuclear power reactor facility is NT$15,000,000 from the date of issuance of the construction permit to the day before issuance of the operating license. During effective period of the construction permit, if the construction suspended and licensee only preserves and maintains the partially completed facilities, the annual fee is NT$5,000,000 per unit.The inspection fee referred to in the preceding paragraph shall be charged based on calendar year. If the period is less than one year, the fee shall be calculated proportionally based on the actual number of days.
中文原文 核子反應器設施管制收費標準第5條
動力用核子反應器設施建廠檢查費,自建廠執照核發之日起,迄運轉執照核發前一日止,每年每機組新臺幣一千五百萬元。
但建廠執照有效期間,暫停建廠並僅維持已建設施之保存及維護作業者,每年每機組新臺幣五百萬元。
前項收費按日曆年逐年收取,未滿一年者,依實際日數比例計算之。