Water Act Article 83-9
The peak discharge reduction scheme referred to in the preceding two articles shall be able to reduce the peak discharge increasing due to the land development and utilization, making the peak discharge after the land development under the inspection standards lower than that before the land development.The Check Criteria referred to in the preceding paragraph and the calculation method for peak flow shall be announced by the central authority-in-charge.
中文原文 水利法第83-9條
前二條之削減洪峰流量方案,應能削減因土地開發利用所增加之洪峰流量,使土地開發利用基地排水出流於檢核基準下之開發後洪峰流量不超過開發前洪峰流量。
前項檢核基準及洪峰流量計算方法,由中央主管機關公告。
前項檢核基準及洪峰流量計算方法,由中央主管機關公告。