Water Act Article 83-8

If the land development and utilization referred to Paragraph 1 of the preceding article involves the application for the change in non-urban-land-use zoning in accordance with the Regional Plan Act or the application for the change in the urban-land-use zoning or the land reserved for public facilities, the obligator shall, in addition to acting in accordance with the regulations of the preceding article, apply to the authority-in-charge of relevant industry in advance with the outflow control proposal presented to ensure sufficient space of land development and utilization for outflow control facilities; then, the authority-in-charge of relevant industry will forward the application to the municipal or city (county) authority-in-charge which the land is under the jurisdiction of for approval.If the land development and utilization referred to in the preceding paragraph is under the jurisdiction of a central agency, the outflow control plan shall be approved by the central authority-in-charge.Before the outflow control proposal is approved, the authority-in-charge of land change shall not change the land zoning or use referred to in Paragraph 1 without permission.The outflow control proposal shall include the following particulars:1. Overview of land development and utilization.2. Survey of the base status.3. A peak discharge reduction scheme.4. Other related documents.Regulations governing the submission, review and approval of the outflow control proposal and other related matters shall be stipulated by the central authority-in-charge.
中文原文 水利法第83-8條
為確保土地開發利用預留足夠出流管制設施空間,前條第一項土地開發利用如涉及依區域計畫法申請非都市土地使用分區變更、依都市計畫法申請都市土地使用分區或公共設施用地變更,義務人除應依前條辦理外,應先提出出流管制規劃書向目的事業主管機關申請,由目的事業主管機關轉送該土地所在地之直轄市、縣(市)主管機關核定。
前項土地開發利用屬中央機關興辦者,其出流管制規劃書,由中央主管機關核定。
土地變更主管機關應於出流管制規劃書核定後,始得核定第一項土地使用分區或用地變更。
出流管制規劃書應包括下列事項:
一、土地開發利用概述。
二、基地現況調查。
三、削減洪峰流量方案。
四、其他相關文件。
出流管制規劃書之提送、審查、核定及其他相關事項之辦法,由中央主管機關定之。

English translation for reference only; the Chinese text prevails. Not legal advice.