Water Act Article 83-7
When runoff increases due to the land development and utilization at a certain scale or above, the obligator shall apply to the central authority-in-charge of relevant industry with the outflow control plan presented; then, the central authority-in-charge of relevant industry will forward the application to the municipal or city (county) authority-in-charge which the land is under the jurisdiction of for approval.The obligator referred to in the preceding paragraph refers to the developer, operator, user or owner of the land.If the land development and utilization referred to in Paragraph 1 is under the jurisdiction of a central agency, the outflow control plan shall be approved by the central authority-in-charge.Before the outflow control plan is approved, an authority-in-charge of relevant industry shall not issue the permit to develop and use the land referred to in Paragraph 1 without permission.After the outflow control plan is approved, the obligator shall construct, use, manage and maintain the land based on the approved plan; after completion, the obligator shall check regularly and keep records of the checks and submit the records to the municipal or city (county) authority-in-charge for review; the municipal or city (county) authority-in-charge may supervise and audit the construction, use, management and maintenance of the outflow control facilities.In case of a certain degree of differences between the actual construction, use, management and maintenance of outflow control facilities and the approved outflow control plan due to any changes in land development and utilization or natural factors, the obligator shall apply for the change in the outflow control plan according to the procedures prescribed in Paragraph 1.The outflow control plan shall include the following particulars:1. Overview of land development and utilization.2. Survey of the base status.3. A peak discharge reduction scheme.4. A construction plan and a use, management and maintenance plan.5. Other related documents.If the particulars referred to in the preceding paragraph have been implemented according to the outflow control proposal approved in accordance with Article 83-8 without any changes, they may be exempt from review.Regulations governing a certain scale of land development and utilization, the submission, review, approval, records of checks and supervision and audit of the outflow control plan and a certain degree of differences between the outflow control facilities and the approved plan as well as the changes in the outflow control plan and other related matters shall be stipulated by the central authority-in-charge.
中文原文 水利法第83-7條
辦理土地開發利用達一定規模以上,致增加逕流量者,義務人應提出出流管制計畫書向目的事業主管機關申請,由目的事業主管機關轉送該土地所在地之直轄市、縣(市)主管機關核定。
前項義務人,指該土地之開發人、經營人、使用人或所有人。
第一項土地開發利用屬中央機關興辦者,其出流管制計畫書,由中央主管機關核定。
出流管制計畫書核定前,各目的事業主管機關不得逕行核發第一項土地之開發或利用許可。
出流管制計畫書核定後,義務人應依其內容施工、使用、管理及維護,並於完工後定期檢查作成檢查紀錄,送直轄市、縣(市)主管機關備查;直轄市、縣(市)主管機關得監督查核其出流管制設施施工、使用、管理及維護情形。
因土地開發利用變更或自然因素影響,致出流管制設施之實際施工、使用、管理或維護與原核定出流管制計畫書之差異達一定程度以上者,義務人應申請變更出流管制計畫書;其變更程序,準用第一項規定程序辦理。
出流管制計畫書應包括下列事項:
一、土地開發利用概述。
二、基地現況調查。
三、削減洪峰流量方案。
四、工程計畫及使用、管理與維護計畫。
五、其他相關文件。
前項各款內容依第八十三條之八規定已核定之出流管制規劃書辦理且未變更之部分,得免再送審。
土地開發利用之一定規模、出流管制計畫書之提送、審查、核定、檢查紀錄、監督查核、出流管制設施與核定計畫差異之一定程度、出流管制計畫書之變更及其他相關事項之辦法,由中央主管機關定之。
前項義務人,指該土地之開發人、經營人、使用人或所有人。
第一項土地開發利用屬中央機關興辦者,其出流管制計畫書,由中央主管機關核定。
出流管制計畫書核定前,各目的事業主管機關不得逕行核發第一項土地之開發或利用許可。
出流管制計畫書核定後,義務人應依其內容施工、使用、管理及維護,並於完工後定期檢查作成檢查紀錄,送直轄市、縣(市)主管機關備查;直轄市、縣(市)主管機關得監督查核其出流管制設施施工、使用、管理及維護情形。
因土地開發利用變更或自然因素影響,致出流管制設施之實際施工、使用、管理或維護與原核定出流管制計畫書之差異達一定程度以上者,義務人應申請變更出流管制計畫書;其變更程序,準用第一項規定程序辦理。
出流管制計畫書應包括下列事項:
一、土地開發利用概述。
二、基地現況調查。
三、削減洪峰流量方案。
四、工程計畫及使用、管理與維護計畫。
五、其他相關文件。
前項各款內容依第八十三條之八規定已核定之出流管制規劃書辦理且未變更之部分,得免再送審。
土地開發利用之一定規模、出流管制計畫書之提送、審查、核定、檢查紀錄、監督查核、出流管制設施與核定計畫差異之一定程度、出流管制計畫書之變更及其他相關事項之辦法,由中央主管機關定之。