The Nuclear Materials and Radioactive Waste Management Act Article 9

Even after the completion of construction of production (and/)or storage facilities of nuclear source material (and/)or nuclear fuel, the facilities shall not be formally operated, until the competent authorities have inspected the construction engineering and qualified the pre-operation thereof, and have issued an operation license therefor.Before the issuance of the operation license for production (and/)or storage facilities of nuclear source material (and/)or nuclear fuel, the competent authorities shall verify that an approval from the domestic or foreign final disposal facilities for storage of radioactive waste, or a contract for handling the same on an agency basis has been obtained.The valid period of the license referred to in Paragraph 1 of this Article is forty (40) years at longest, and when there is need to continue operation after the license is expired, an application shall be filed two (2) years prior to expiration thereof with the competent authorities for renewing the license thereof. The operation thereof shall not be continued without the renewal of license as per the prescription.Paragraph 1 of the preceding Article is applicable, mutatis mutandis, to the issuance and(/or) the renewal of an operation license; Paragraph 2 (of the preceding Article) is also applicable, mutatis mutandis, to the renewal of an operation license.
中文原文 放射性物料管理法第9條
核子原料、核子燃料生產或貯存設施興建完成後,非經主管機關檢查其興建工程及試運轉合格,並發給運轉執照,不得正式運轉。
核子原料、核子燃料生產或貯存設施運轉執照核發前,主管機關應驗證該設施已取得國內、外放射性廢棄物最終處置設施之貯存許可或代處理契約。
第一項執照之有效期間,最長為四十年;期滿需繼續運轉者,應於期限屆滿二年前,向主管機關申請換發執照。
未依規定換照者,不得繼續運轉。
運轉執照之核發及換發,準用前條第一項規定;運轉執照之換發並準用第二項規定。

English translation for reference only; the Chinese text prevails. Not legal advice.