Administrative Regulations for the Establishment and Operation of a Telecommunications Network for the Academic and Education Purposes or Dedicated Experiments and Research and Development Purposes Article 42

When making a change to the establishment schedule, the applicant or administrator shall state the reasons and submit the changed proposal and information to the competent authority for approval. If approved, a certificate of approval for network establishment or a license for the establishment and operation of network shall be issued in exchange of. However, if the change only involves the relocation of the radio station, and the coverage of the radio wave does not exceed the original approved area, the applicant or administrator can be exempt from attaching the revised establishment proposal and the comparison information for the review of the competent authority in accordance to Paragraph 1, Article 36.If the change specified in the preceding paragraph falls under any one of the following circumstances, the reasons shall be stated and the revised establishment proposal and the comparison information shall be attached to the competent authority for reference:1. Changing the network communication method or system architecture.2. Suspending the use of some radio stations.If the change specified Paragraph 1 is a change in the user usage regulations or contract that is not related to the charge, or an addition of a radio station whose radio wave coverage does not exceed the original approved area, and it belongs to a technical or commercial experiments and research and development telecommunications network using an experimental frequency in a specific experimental field, the reasons may be stated and the revised establishment proposal and the comparison information shall be attached and submitted to the competent authority for reference.If the change specified in Paragraph 1 is in compliance with the provisions of Paragraph 5, Article 13, the competent authority may re-issue a license certificate and exempt the review fee and license fee.If the change specified in Paragraphs 2 and 3 involve the changes in the approval certificate of the network establishment or the recorded items of the usage license, the applicant or administrator shall apply to the competent authority for the replacement operation.The term of validity of the certificate of approval for network establishment or the license for the establishment and operation of network as stipulated in Paragraph 1, Paragraph 4, and the preceding paragraph shall be the same as the original copies.
中文原文 學術教育或專為網路研發實驗目的之電信網路設置使用管理辦法第42條
申請人或管理者變更經核定之設置計畫時,應敘明理由並檢具變更後設置計畫書與對照資料,報請主管機關審核,經核准後,換發網路架設核准證明或設置使用執照。
但變更事項僅涉遷移無線電臺位置,且其電波涵蓋範圍未逾越原核定區域,申請人或管理者得逕依第三十六條第一項辦理,免檢具變更後設置計畫書與對照資料報請主管機關審核。
前項變更如符合下列情形之一者,得敘明理由並檢具修正後設置計畫與變更對照資料報請主管機關備查:
一、變更網路通信方式或系統架構。
二、暫停使用部分無線電臺。
第一項變更如屬與收費無關之用戶使用規章或契約之變更,或增設無線電臺,其電波涵蓋範圍未逾越原核定區域,且屬於特定實驗場域使用特定實驗頻率之技術或商業實驗研發電信網路者,得敘明理由並檢具修正後設置計畫與變更對照資料報請主管機關備查。
第一項變更如為配合主管機關辦理第十三條第五項規定者,主管機關得逕予換發證照,並得免收審查費及執照費。
第二項及第三項變更涉及網路架設核准證明或設置使用執照登載事項異動者,申請人或管理者應向主管機關辦理換發作業。
第一項、第四項及前項換發網路架設核准證明或設置使用執照之有效期限與原證照相同。

English translation for reference only; the Chinese text prevails. Not legal advice.