Regulation for the Use and Management of Wastewater Treatment and Sewage System in the Science Park Article 4
When applying for construction permit in the Park’s area where the sewage system has been constructed and completed, one must enclose the information such as the illustration of drainage facility, the configuration drawing, the location of discharge point,etc. and submit the same to the Bureau for approval.Upon the completion of the aforesaid drainage facility, coupling and discharging are allowed only after inspected by the Bureau to be qualified.
中文原文 科學園區污水處理及污水下水道使用管理辦法第4條
園區污水下水道系統完成地區申請建照時,應檢附排水設備圖說、配置圖、排放口位置等資料向管理局申請核准。
前項排水設備完工後,應經管理局檢查合格,始得聯接排放。