Regulations for Safety Inspection of Hazardous Machines and Equipment Article 12
Upon completing the installation of the fixed type cranes or altering its location, the Employer shall fill out the Application Form for Completion Inspection of Fixed Type Cranes (Annex 3) and submit it along with the documents as shown below to the local inspecting organization to apply for completion inspection:1. Qualification Certification for the type inspection of manufacturing facilities (for imported facilities, documents relating to quality control etc. shall be attached).2. Plan of the installation site, summary of the foundation, and its traveling range.3. Specification of Fixed Type Cranes (Annex 4).4. Strength calculation basis and assembly drawings.Annex 3 Application Form for Completion Inspection.PDFAnnex 4 Specification of Fixed Type Cranes.PDF