Regulations for Safety Inspection of Hazardous Machines and Equipment Article 13

The contents of the completion inspection of the r fixed type cranes include the items as shown below:1. Structure and performance inspection: including review of the strength calculation for structure, selection of dimensions and materials, review of lifting load, installation and performance of safety devices, inspection of electrical and mechanical parts, methods of construction, as-required identification of rated load and lifting load etc., operating speed of various devices under no load and rated load conditions and other inspection items as required.2. Load test: The load test refers to a test that is performed for purpose of verifying the as-required hoist, traveling, and rotating actions of the crane as well as the traveling action of the trolley by placing a load weighing 1.25 times of the rated load of the crane ( or 50 tons plus the rated load of the crane whenever the rated load exceeds 200 ton) on the load-lifting attachment of the crane during the test.3. Stability test: The stability test refers to a test that is performed by placing a test load weighing 1.27 times of the rated load of the crane, on the hoisting equipment under the most adverse conditions with respect to stability, and also without use of the runaway prevention devices and rail clip devices.4. Other as-required inspections.Those fixed type cranes of overhead or bridge type, that are free from being overturned, may be exempted from the test requirements stipulated under the preceding Item 3 of this Paragraph.Those imported cranes evidenced by substantial inspection certificates, may be granted a full or partial exemption from the inspection requirements as stipulated under the preceding Paragraph 1 by the Inspecting Organization.Those cranes which hold a valid qualification certificate through previous completion inspection and are to be relocated following the sequence of construction activities, may be granted a full or partial exemption from the inspection requirements as stipulated under the preceding Paragraph 1 by the Inspection Organization, as long as the cranes’ own structure and trolleys remain in an intact condition, namely without being dismantled and reassembled.
中文原文 危險性機械及設備安全檢查規則第13條
固定式起重機竣工檢查,包括下列項目:
一、構造與性能檢查:包括結構部分強度計算之審查、尺寸、材料之選用、吊升荷重之審查、安全裝置之設置及性能、電氣及機械部分之檢查、施工方法、額定荷重及吊升荷重等必要標示、在無負載及額定荷重下各種裝置之運行速率及其他必要項目。
二、荷重試驗:指將相當於該起重機額定荷重一點二五倍之荷重(額定荷重超過二百公噸者,為額定荷重加上五十公噸之荷重)置於吊具上實施必要之吊升、直行、旋轉及吊運車之橫行等動作試驗。
三、安定性試驗:指將相當於額定荷重一點二七倍之荷重置於吊具上,且使該起重機於前方操作之最不利安定之條件下實施,並停止其逸走防止裝置及軌夾裝置等之使用。
四、其他必要之檢查。
固定式起重機屬架空式或橋型式等無虞翻覆者,得免實施前項第三款所定之試驗。
外國進口具有相當檢查證明文件者,檢查機構得免除第一項所定全部或一部之檢查。
經檢查合格,隨施工進度變更設置位置,且結構及吊運車未拆除及重新組裝者,檢查機構得免除第一項所定全部或一部之檢查。