Regulations Governing Airport Terminal Preparation, Construction, and Operation Article 16
The airport terminal shall file with CAA for MOTC permission before suspension of operation which shall not exceed 6 months. If the aforesaid suspension goes beyond the time limit, CAA may report to MOTC and request a withdrawal of its certificate; provided, however, that an application for extension thereof may be granted with good cause shown. The period for such extension shall not exceed 6 months and the extension shall be limited to one-time only.Before the operation certificate is withdrawed as stated in the preceding paragraph, a concerned airport operator may file with CAA for MOTC approval for resumption of operation when the cause of suspension of operation ceases to exist.
中文原文 航空站籌設興建及營運管理辦法第16條
航空站停止營運時,應先報請民航局核轉交通部核准,始得停止營運。
停止營運之期限不得逾六個月,逾六個月者,由民航局報請交通部核准後廢止許可。
但有正當理由經申請核准延展者,不在此限。
核准延展期限不得逾六個月,並以一次為限。
前項航空站營運許可未經廢止前,航空站經營人得於停止營運之原因消失時,報請民航局核轉交通部核准後,恢復營運。
停止營運之期限不得逾六個月,逾六個月者,由民航局報請交通部核准後廢止許可。
但有正當理由經申請核准延展者,不在此限。
核准延展期限不得逾六個月,並以一次為限。
前項航空站營運許可未經廢止前,航空站經營人得於停止營運之原因消失時,報請民航局核轉交通部核准後,恢復營運。