Regulations Governing Airport Terminal Preparation, Construction, and Operation Article 15
When the airport terminal ownership is transferred, the new operator is required to submit the following documents in duplicate to the CAA. Upon a satisfactory inspection jointly conducted by CAA and relevant authorities, the application shall be submitted to MOTC for approval. After the approval having been granted by MOTC, and the CAA issue an operation certificate, the airport terminal can thereafter be operated.1) Transfer agreement from the original operator.2) Operation management manual.3) Aerodrome certification for the facilities and operations of the movement area.4) The building within the airport shall get the proof of approval from the building authority for use of buildings or get the conformity certification after passing the acceptance check by the fire regulation authority.5) Public notice from the concerned special municipality or county/city government on the positions of the stakes around areas where construction is prohibited or restricted6) Proof of purchase of liability insurance by the airport terminal.7) Those operating under corporate structure shall also submit the list of board directors and supervisors, name of representative or manager, company charter, and list of shareholders.When the airport terminal ownership is transferred, the CAA shall request the MOTC for approval to withdraw the original operation certificate.
中文原文 航空站籌設興建及營運管理辦法第15條
航空站轉讓時,新經營人應檢附下列文件一式二份,申請民航局會同有關機關會勘合格,報請交通部核准,並由民航局發給航空站營運許可證,始得營運:
一、原航空站經營人轉讓同意書。
二、營運管理手冊。
三、供航空器起飛、降落及地面活動區域之設施及作業之空側認證證書。
四、航空站內建築物,應檢附建築主管機關核准使用或消防主管機關竣工查驗合格之相關證明文件。
五、直轄市、縣(市)政府禁限建樁位公告函。
六、航空站投保責任保險證明文件。
七、屬公司組織者,應檢附董事、監察人名冊、代表人或經理人名冊、公司章程及股東名簿。
航空站轉讓時,由民航局報經交通部核准後廢止原營運許可。
一、原航空站經營人轉讓同意書。
二、營運管理手冊。
三、供航空器起飛、降落及地面活動區域之設施及作業之空側認證證書。
四、航空站內建築物,應檢附建築主管機關核准使用或消防主管機關竣工查驗合格之相關證明文件。
五、直轄市、縣(市)政府禁限建樁位公告函。
六、航空站投保責任保險證明文件。
七、屬公司組織者,應檢附董事、監察人名冊、代表人或經理人名冊、公司章程及股東名簿。
航空站轉讓時,由民航局報經交通部核准後廢止原營運許可。