Enforcement Rules for the Ionizing Radiation Protection Act Article 12

When applying for a construction permit of a radioactive material production facility in accordance with Paragraph 30.1 of the IRP Act, an application shall be filed six (6) months prior to the predeterminate construction, and the following documents and information shall be attached and submitted to the Competent Authority for review:1. the company registration certificate or other relevant documents,2. the physical, chemical, and radiological properties of radioactive material,3. the production methods, production plans, and sales plans,4. the quality assurance plan,5. the radiation safety assessment report, radiation protection plan and safe operation procedure,6. the treatment plans for radioactive waste, and7. other documents or information specified by the Competent Authority.
中文原文 游離輻射防護法施行細則第12條
依本法第三十條第一項規定申請放射性物質生產設施之建造許可者,應於預定建造日期六個月前填具申請書,並檢附下列文件及資料,向主管機關申請審查:
一、公司登記證明文件或其他設立證件。
二、放射性物質之物理、化學及輻射性質。
三、生產方法、生產計畫及銷售計畫。
四、品質保證計畫。
五、輻射安全評估報告、輻射防護計畫及安全作業程序。
六、放射性廢棄物處理計畫。
七、其他主管機關指定之文件或資料。

English translation for reference only; the Chinese text prevails. Not legal advice.