Fees for Regulatory Services under the Nuclear Materials and Radioactive Waste Act Article 16
The review fees for construction, operation, closure, and exemption from institutional control as well as the inspection fees for site characterization survey, construction, operation and closure of high level waste final disposal facilities are as follows:1.The site characterization survey inspection fee: NT$10,000,000 per facility per year.2.Construction and operation review fee: NT$60,000,000 for each application.3.Construction, operation and closure inspection fee: NT$20,000,000 per facility per year.4.The review fee for closure or exemption from institutional control: NT$20,000,000 for each application.
中文原文 放射性物料管制收費標準第16條
高放射性廢棄物最終處置設施興建、運轉、封閉與免於監管審查費及場址特性調查、興建、運轉、封閉檢查費,其收費標準如下:
一、場址特性調查檢查費,每年每一設施新臺幣一千萬元。
二、興建、運轉審查費,每一申請案各新臺幣六千萬元。
三、興建、運轉、封閉檢查費,每年每一設施各新臺幣二千萬元。
四、封閉或免於監管審查費,每一申請案新臺幣二千萬元。
一、場址特性調查檢查費,每年每一設施新臺幣一千萬元。
二、興建、運轉審查費,每一申請案各新臺幣六千萬元。
三、興建、運轉、封閉檢查費,每年每一設施各新臺幣二千萬元。
四、封閉或免於監管審查費,每一申請案新臺幣二千萬元。