Regulations for Administration of Mobile Broadband Businesses Article 45

The nominated bidder or operator may apply to transfer its own system equipment or equipment of other mobile communications operator as a part of itsmobile broadband system.Where foresaid transfer is involved with business termination, or business or asset transfer of mobile communications operator, it shall conduct relevant activities according to Article 15 of the Act.The nominated bidder or operator that plans to transfer equipment in accordance with Paragraph 1 shall include the system installation, when applying for system installation permit according to Paragraph 1 of Article 43; change to system installation plan according to Paragraph 5 of Article 43; or installation approval for the following network according to Paragraph 6 of Article 43. Equipment that is located in the same location prior to and preceding the installation may not be removed upon receipt of the installation permit.Those who transfer system equipment that is in use may be exempted from system technical examination if no change has been made to the system hardware / software equipment after the transfer.
中文原文 行動寬頻業務管理規則第45條
得標者或經營者得申請將其自身或其他行動通信網路業務經營者之系統設備,移用為其行動寬頻系統之一部。
前項移用涉及行動通信網路業務經營者終止營業、讓與營業或財產者,應依本法第十五條規定辦理。
得標者或經營者擬依第一項規定移用者,應於依第四十三條第一項申請系統架設許可時、第四十三條第五項向主管機關申請核准變更系統建設計畫或第四十三條第六項向主管機關申請後續網路之架設許可時,納入其系統建設計畫。
其屬移用前後設置處所相同之設備者,於取得架設許可前,得免予拆除。
移用使用中之系統設備且移用後未變更系統軟硬體設備者,得免予系統技術審驗。

English translation for reference only; the Chinese text prevails. Not legal advice.