Regulations for the Handling of Overdue US Economic Aid Loans Article 9
If after taking receipt of distributed US Aid materiel the borrower breaches the terms of the supply contract or fails to make payment of all monies due after action has been taken to press for the same in accordance with the provisions of these guidelines, the bank should, after reporting to the CEPD and obtaining approval therefrom, immediately dispatch personnel to take possession of the said materiel, or directly institute legal proceedings for the return of the materiel, and at the same time claim damages for any losses incurred.
中文原文 逾期美援貸款處理辦法第9條
借款人受配美援器材後,違反美援器材供應合約之規定,或經依本辦法之規定催收,不為清償時,銀行於報經經建會核定後,應即派員占有美援器材,或逕以原告資格,提起返還器材之訴,同時主張損害賠償。