Enterprises or sewage systems designated by the central competent authority shall conduct testing for emerging contaminants in accordance with Table 6.If the effluent test results mentioned in Paragraph 1 exceed the values specified in Table 6 for two consecutive occurrences, a self-determined reduction management plan for that parameter shall be submitted within three months to the municipal or county (city) competent authority for record-keeping and implementation. The execution period of the self-determined reduction management plan shall not exceed two years, during which testing for the specified parameter under Table 6 shall be exempted.Within 30 days after the execution period of the self-determined reduction management plan ends, the enterprise or wastewater sewage system shall submit an improvement report to the municipal or county (city) competent authority.If the test results for the effluent parameter mentioned in Paragraph 1 do not exceed the values specified in Table 6 for three consecutive occurrences, testing and reporting for that parameter may be exempted. If an inspection by the competent authority shows that the values exceed the specified limits, testing shall resume in accordance with Paragraph 1.Table 6. Testing and reporting requirements of enterprises or sewage system for emerging contaminants.pdf