Water Pollution Control Measures and Test Reporting Management Regulations Article 76
Enterprises or sewage systems that connect their wastewater or sewage to dedicated sewage systems in an industrial park shall report the following:I. The process facilities and production or service scales related to production of the wastewater or sewage and sludge on a monthly basis.II. The quality of the water discharged into the sewage system and the volume of water on the testing day as well as the source of water, consumption of water, and the volume of the wastewater or sewage discharged into the sewage system on a monthly basis.III. Where wastewater or sewage pre-treatment facilities as set up, additional reports are required pursuant to Articles 73 to 75.