Water Pollution Control Measures and Test Reporting Management Regulations Article 17

The independent and exclusive electricity meters that enterprises or sewage systems set up for the wastewater or sewage treatment/pre-treatment facilities shall meet the following requirements:I. The specifications shall meet relevant requirements of The Weights and Measures Act, and the entire electricity consumed for the wastewater or sewage treatment/pre-treatment facilities shall be measured.II. An transparent window shall be available.III. The electricity meters shall be sealed with lead sealing by a competent authority or electric power company; the seal shall be confirmed by the competent authority and shall not be destroyed.IV. The source and destination of incoming and outgoing circuits shall be marked explicitly.For maintenance or replacement of the electricity meters referred to in the preceding paragraph, the seal may be torn off only after informing the competent authority. The electricity consumption shall be recorded during the maintenance or replacement; the recording method shall be subject to the consent of the competent authority. The competent authority shall be informed within one week after the maintenance or replacement.In case no independent and exclusive electricity meters can be set up for wastewater or sewage treatment/pre-treatment facilities, the facilities that have automatic control, measurement, and recording functions may be used to measure and record the consumption of electricity after being approved by the competent authority.
中文原文 水污染防治措施及檢測申報管理辦法第17條
事業或污水下水道系統設置之廢(污)水(前)處理設施獨立專用電度表,應符合下列事項:
一、規格應符合度量衡法規之相關規定,並應能量測廢(污)水(前)處理設施之全部用電量。
二、應有透明視窗。
三、應由主管機關鉛封,或由電力業者鉛封,經主管機關確認,不得任意破壞。
四、進出電路應標明來源及去處。
維護更換前項電度表前,應向主管機關報備,始得拆封。
維護更換期間之用電度數仍應加以記錄;其記錄方式應取得主管機關之同意。
維護更換後一週內,應向主管機關報備。
無法於廢(污)水(前)處理設施設置獨立專用電度表者,得經主管機關同意,以具有自動控制量測記錄功能之設施,量測記錄用電量。

English translation for reference only; the Chinese text prevails. Not legal advice.