Noise Control Act Enforcement Rules Article 7

The land transportation system noise improvement projects in Article 14, Paragraph 1 of this Act and other traffic noise improvement projects in Article 15, Paragraph 1 of this Act shall include the following items:I.The operating or management agency (organization) responsible for implementing improvements.II.An explanation of the traffic situation in road sections in which noise levels exceed land transportation system noise control standards or environmental sound level standards (including traffic flow, vehicle composition, and operating speed), and plan, longitudinal, and cross-sectional drawings (including the complainant's location or measurement point).III.Noise measurement results prior to improvement along the road section in question exceeding land transportation system noise control standards or environmental sound level standards, analysis of causative factors, and degree of influence.IV.Explanation of the content of the adopted noise control measures. Design illustrations showing the locations, sizes, and functions of relevant noise control facilities shall be included therein.V.Assessment of the improvement function of the adopted noise control measures.VI.Project implementation timetable.VII.Views of residents along the road section in which the project will be implemented.VIII.Feasibility assessment of improvements.IX.Other documents designated by the competent authoritySpecial municipality, county and city competent authorities shall complete review and approval of the noise improvement projects in the foregoing paragraph within sixty days after receipt. If project content is deficient or does not comply with regulations, the operating or management agency (organization) shall be notified within thirty days after receipt to make corrections within a limited time period, and the total number of days for correction may not exceed sixty days; the correction period shall not be included in the review period.If the operating or management agency (organization) fails to complete correction within the time period specified in the foregoing paragraph, the noise improvement project shall be considered not to have been submitted in accordance with Article 29 of this Act.
中文原文 噪音管制法施行細則第7條
本法第十四條第一項之陸上運輸系統噪音改善計畫及第十五條第一項之其他交通噪音改善計畫,應包括下列事項:
一、應執行改善之營運或管理機關(構)。
二、超過陸上運輸系統噪音管制標準或環境音量標準之路段交通狀況說明(包含交通流量、運具組成、營運速率)及平面、縱面及斷面圖說(含陳情戶位置或量測點)。
三、改善前超過陸上運輸系統噪音管制標準或環境音量標準之路段噪音量測結果及其成因分析、影響程度。
四、所採取相關噪音防制措施內容說明。
其中有關之噪音防制設施,應記載其位置、規模及功能等設計圖說。
五、採取噪音防制措施之改善功能評估。
六、計畫執行期程。
七、執行計畫路段沿線民眾意見。
八、改善可行性分析。
九、其他經主管機關指定之文件。
直轄市、縣(市)主管機關應於前項噪音改善計畫送達之日起六十日內完成審查並核定之。
計畫內容有欠缺或不合規定者,應於送達之日起三十日內通知營運或管理機關(構)限期補正,且核准補正之總日數不得超過六十日;補正日數不算入審查期間內。
營運或管理機關(構)逾期未依前項規定完成補正者,視為未依本法第二十九條規定檢送噪音改善計畫。

English translation for reference only; the Chinese text prevails. Not legal advice.