Regulations for Safety Inspection of Hazardous Machines and Equipment Article 71
Before proceeding with manufacturing or making modification to the boilers, the Manufacturer shall fill up the type inspection application form (Annex 31) and submit the same along with the documents listed shown below to the local inspecting organization:1. Type, detailed drawings of structure and strength calculation for the boiler applying for inspection.2. Type, capacity and quantity of manufacturing and inspection equipment.3. Brief description of educational background and working experience of the chief designer.4. Brief description of educational background and working experience of the construction director.5. Qualification certificates of the Constructor and number of the construction workers.6. Qualification certificates of the welders, specifications of welding procedures, and records of inspection qualification for welding procedures for those manufacturing or modification work to be made by welding method.Any alteration of the equipment stipulated inabove Item 2 or change of personnel stipulated in preceding Paragraphs 3 and 4 shall be reported to the local inspecting organization.The inspecting organization shall issue the Qualification Certificate of Type Inspection for Manufacturing Equipment (Annex 2) for the boilers qualified by the type inspection as stipulated in Paragraph 1.The manufacture or modification task shall be prohibited from implementation without passing the inspection. However, this restriction shall not apply to the case where the types and conditions have previously passed the type inspection.