Regulations for Safety Inspection of Hazardous Machines and Equipment Article 29

When altering any of the following items of the mobile type crane, the employer shall submit the drawings relating to the altered parts to the inspecting organization for reference and record:1. Prime motor.2. Hoisting structure.3. Steel wire rope or hoisting chain.4. Hook, grab bucket or other devices.5. Braking devices.The requirements stipulated in the preceding Paragraph are not applicable to those alterations where the involved materials, specifications, and dimensions remain unchanged.If the employer changes the lifting capacity of the mobile type crane to a capacity less than that stipulated in Item (2), Paragraph 2, Article 3, a report shall be made to the inspecting organization for confirmation and revocation of its inspection qualification certificate.
中文原文 危險性機械及設備安全檢查規則第29條
雇主對於移動式起重機變更下列各款之一時,應檢附變更部分之圖件,報請檢查機構備查:
一、原動機。
二、吊升結構。
三、鋼索或吊鏈。
四、吊鉤、抓斗等吊具。
五、制動裝置。
前項變更,材質、規格及尺寸不變者,不在此限。
雇主變更移動式起重機之吊升荷重為未滿第三條第二款第二目之容量者,應報請檢查機構認定後,註銷其檢查合格證。

English translation for reference only; the Chinese text prevails. Not legal advice.