Regulations for Safety Inspection of Hazardous Machines and Equipment Article 116
Once the category Ι pressure vessel has been qualified through the re-inspection process, the specification of the said boiler shall be stamped with a qualification mark(Annex 34) and signed by the inspector of the Inspection Organization.One(1) copy of the above-mentioned specification shall then be delivered to the applicant to serve as an evidence of the qualification status of the re-inspection, for use to proceed with the Completion Inspection. However, for those pressure vessel which have been either idle for over one(1) year after being qualified by the completion/periodic inspection, or prohibited from operation as respectively stipulated in Items 2 and 3 under Paragraph 1 of Article 114, if the said pressure vessels which either remain at their original locations or are relocated at other places in the shop, are qualified by the inspection, the Inspection Organization may add the date and result of the inspection as well as the operation expiration duration with one(1) year as a maximum, on the original qualification certificate.For those imported category Ι pressure vesse, the qualification mark shall be stamped on the distinct portion of the same after being inspected for identification purpose.