Regulations Governing the Assessment of Energy Development and Utilization Article 12

This English translation was last updated on 2025-11-03, but the Chinese text was amended on 2026-09-15. Later amendments may not be reflected in the translation — please refer to the Chinese text.

For the following circumstances where no corrective action is made or the correction is incomplete within the time prescribed in central competent authorities’ order, the central competent authorities may reject the application:1. The consumption volume, category, or location listed on the energy utilization manual does not comply with rules set in Article 5 or Article 8.2. The efficiency listed on the energy utilization manual does not comply with Article 7 or Article 9.
中文原文 能源開發及使用評估準則第12條
能源使用說明書經審查有下列情形之一者,經中央主管機關通知限期補正而屆期未補正或補正不完備者,得作成不予核准之處分:
一、能源使用說明書所記載之使用數量、種類、區位,不符第五條或第八條之規定。
二、能源使用說明書所記載之效率,不符第七條或第九條之規定。

English translation for reference only; the Chinese text prevails. Not legal advice.