Regulations on Rewarding for Demonstration of Renewable Energy Installation in Indigenous Areas Article 6
The maximum reward amount for the planning and assessment stage is NT$2 million.The maximum reward amount for the implementation and installation stage is NT$10 million, and the rewards are subject to the following conditions:1. The total reward amount for renewable energy power generation equipment (or including energy storage equipment) shall not exceed 50% of the total installation cost.2. The reward amount for energy storage equipment shall not exceed NT$16,000 per kilowatt-hour.The initial installation cost parameter used in the calculation formula for the feed-in tariff of electricity generated by renewable energy power generation equipment installed with rewards under the preceding paragraph shall be deducted by the reward amount for renewable energy power generation equipment.
中文原文 原住民地區參與再生能源設置示範獎勵辦法第6條
規劃評估階段之獎勵額度以新臺幣二百萬元為上限。
執行設置階段之獎勵額度以新臺幣一千萬元為上限,且須符合下列各款情形:
一、再生能源發電設備(或含儲能設備)之獎勵額度總和不得超過總設置經費之百分之五十。
二、儲能設備獎勵額度以每瓩時新臺幣一萬六千元為上限。
前項獲獎勵設置之再生能源發電設備所產生電力,其電能躉購費率計算公式之期初設置成本參數須扣除再生能源發電設備獎勵經費。
執行設置階段之獎勵額度以新臺幣一千萬元為上限,且須符合下列各款情形:
一、再生能源發電設備(或含儲能設備)之獎勵額度總和不得超過總設置經費之百分之五十。
二、儲能設備獎勵額度以每瓩時新臺幣一萬六千元為上限。
前項獲獎勵設置之再生能源發電設備所產生電力,其電能躉購費率計算公式之期初設置成本參數須扣除再生能源發電設備獎勵經費。