Renewable Energy Development Act Article 14

For renewable energy power generation equipment that exceeds the installed capacity set by the central competent authority, Articles 38– 44 of the Electricity Act shall apply mutatis mutandis for the rights acquisition, usage procedures, and handling of the land required by such renewable energy power generation equipment and power supply lines.For the installation of renewable energy power generation equipment on land owned by indigenous people or by an indigenous tribe and on the public land in a certain range of neighbouring area, Article 21 of the Indigenous Peoples Basic Law shall apply to the land and area.The term and procedures for renewable energy power generation equipment and power supply lines to lease required public land shall be longer than the effective duration of the electricity enterprise license, without subjection to Article 43 of the National Property Act, the Forestry Act, Article 25 of the Land Act, and limits regarding the term of lease and procedures prescribed by local public property administration regulations.
中文原文 再生能源發展條例第14條
再生能源發電設備達中央主管機關所定一定裝置容量以上者,其再生能源發電設備及供電線路所需使用土地之權利取得、使用程序及處置,準用電業法第三十八條至第四十四條規定。
設置再生能源發電設備於原住民族土地或部落及其周邊一定範圍內之公有土地者,應依原住民族基本法第二十一條規定辦理。
再生能源發電設備及供電線路承租所需公有土地之期間及程序,不得低於電業執照之有效期間,且不受國有財產法第四十三條、森林法、土地法第二十五條及地方政府公產管理法令相關規定有關承租期間及程序之限制。

English translation for reference only; the Chinese text prevails. Not legal advice.