Regulations for the Management of Setting up Renewable Energy Power Generation Equipment of Power Users above a Certain Contract Capacity Article 8
The compulsory user of renewable energy shall complete the submission of the compulsory performance proposal before the end of March of the following year after being notified by the central competent authority. However, this does not apply to those who have performed the obligations already.When the compulsory user of renewable energy makes changes to the proposal described in the preceding paragraph, the user shall prepare a comparison table, explaining the reasons for the changes, and describing the content of the changes, which shall be submitted to the central competent authority for future reference.The compulsory user of renewable energy shall, at the latest in the fourth year after receiving the notification from the central competent authority, report the facility operation information for the installation of renewable energy power generation equipment and energy storage facility in the previous year by the end of March each year. Those who purchase renewable energy and certificate shall provide the certificate of renewable energy and the supporting document for the power wheeling and direct supply within the validity period of the certificate, which shall be submitted to the central competent authority for future reference.The declaration, filing for future reference and document formats described in the preceding three paragraphs shall be specified separately by the central competent authority.If the compulsory user of renewable energy fails to complete the declaration and filing for future reference, or provides incomplete information on declaration and documents for future reference as described in the preceding three paragraphs, the central competent authority may notify the compulsory user of renewable energy to make corrections within a time limit. If the compulsory user of renewable energy fails to make corrections within the time limit, the central competent authority shall cancel part or all of the deducted compulsory installed capacity described in the preceding article depending on the circumstances.
中文原文 一定契約容量以上之電力用戶應設置再生能源發電設備管理辦法第8條
再生能源義務用戶應自中央主管機關通知之次年度三月底前完成申報義務執行計畫書。
但已完成義務履行者不在此限。
再生能源義務用戶就前項計畫有變更時,應製作變更內容對照表,說明變更事由及變更內容,報請中央主管機關備查。
再生能源義務用戶至遲應於收到中央主管機關通知之第四年度起,於每年三月底前申報前一年度設置再生能源發電設備、儲能設備之設備運轉資料;購買再生能源電力及憑證者,應於該憑證有效期限內提供再生能源憑證及電能直轉供證明文件,報請中央主管機關備查。
前三項申報、備查方式及文件格式,由中央主管機關另定之。
再生能源義務用戶未依前三項規定完成申報、備查或申報、備查資料不全者,中央主管機關得通知再生能源義務用戶限期補正;屆期未補正者,中央主管機關得視情節取消部分或全部前條扣減之義務裝置容量。
但已完成義務履行者不在此限。
再生能源義務用戶就前項計畫有變更時,應製作變更內容對照表,說明變更事由及變更內容,報請中央主管機關備查。
再生能源義務用戶至遲應於收到中央主管機關通知之第四年度起,於每年三月底前申報前一年度設置再生能源發電設備、儲能設備之設備運轉資料;購買再生能源電力及憑證者,應於該憑證有效期限內提供再生能源憑證及電能直轉供證明文件,報請中央主管機關備查。
前三項申報、備查方式及文件格式,由中央主管機關另定之。
再生能源義務用戶未依前三項規定完成申報、備查或申報、備查資料不全者,中央主管機關得通知再生能源義務用戶限期補正;屆期未補正者,中央主管機關得視情節取消部分或全部前條扣減之義務裝置容量。