Water Act Article 48
Where applicable, the proprietor of a water work shall draw up a plan for water gate use standards, schedules, and method in connection with structures used in flood control, conveyance, storage, or drainage. Such a plan shall be approved and made public by the authority-in-charge. If deemed necessary, the authority-in-charge may demand changes to the plan within a prescribed period.
中文原文 水利法第48條
防水、引水、蓄水、洩水之建造物,如有水門者,其水門啟用之標準、時間及方法,應由興辦水利事業人預為訂定,申請主管機關核准並公告之,主管機關認為有變更之必要時,得限期令其變更之。