Land Renting and Expense Collecting Standards of Technology Industrial Parks Article 6
If business entity is required to implement the land construction by phases, then its land area should be applied in one time. However whole construction plan of base cannot exceed three years. Additionally it should list the use situation by phases in the investment plan or application. If the aforementioned land construction by phases exceeds the time limit and is not used, then the Bureau of Industrial Parks, Ministry of Economic Affairs (hereinafter referred as the "Bureau") or Branches may inform to recall the land in accordance with contract at any time. The paid land rental and public facility construction expense will not be returned. If there is justifiable reason to do so, the business entity may apply to the Bureau or Branches for postponement before time limit expires.
中文原文 加工出口區土地租用及費用計收標準第6條
在區內營業之事業如需實施分期使用土地建築者,其用地面積得一次申請。
但基地全部使用建築計畫期限不得超過三年,並應於投資計畫或申請書列明分期使用情形。
前項分期使用土地建築而逾期未使用者,經濟部產業園區管理局(以下簡稱園管局)或分局得依約隨時通知收回土地;其已繳土地租金及公共設施建設費用不予退還。
但有正當理由不能按照核定計畫期限分期使用者,得於期限屆滿前向園管局或分局申請延長之。
但基地全部使用建築計畫期限不得超過三年,並應於投資計畫或申請書列明分期使用情形。
前項分期使用土地建築而逾期未使用者,經濟部產業園區管理局(以下簡稱園管局)或分局得依約隨時通知收回土地;其已繳土地租金及公共設施建設費用不予退還。
但有正當理由不能按照核定計畫期限分期使用者,得於期限屆滿前向園管局或分局申請延長之。