Land Renting and Expense Collecting Standards of Technology Industrial Parks Article 17
After the land lease contract is terminated for the land occupation period of the original tenant, damage payment shall be calculated based on the current land rental of the site multiplied by two for the damage collection on a monthly basis. If the period of occupation is less than one month, the damage shall be calculated on a daily basis. If the damage is not paid before the deadline, then additional late interest shall be calculated based on five percent of the annual interest rate until the damage repayment date.
中文原文 加工出口區土地租用及費用計收標準第17條
土地租賃契約終止後,原承租人占用土地期間,依該基地當期土地租金乘二倍,按月計收損害金,不足一個月者,按日計收;如有逾期繳納,應按損害金加計年利率百分之五計算之遲延利息至清償日止。