The Electricity Act Article 82
An operator of Self-Use Power-Generation Equipment for which any of the violations below apply shall be subject to a fine ranging from NT$200,000 to NT$2,000,000 and given a time limit to correct the violation. An operator that fails to correct the violations upon the expiration of the time limit shall be punished consecutively:1. Installing a Self-Use Power-Generation Equipment without permission in violation of paragraph 1, Article 68; significantly failing to comply with the rules governing the management of Self-Use Power-Generation Equipment in paragraph 2, Article 68;2. Selling electric power in violation of paragraph 1, Article 69;3. Installing user-end electricity equipment in violation of paragraph 1, Article 70;4. Failing to immediately dispatch technical personnel to set up high-visibility signs and secure the area as prescribed in Article 71 mutatis mutandis applying Article 34.An operator of Self-Use Power-Generation Equipment for which any of the violations described in Subparagraphs 1 to 3 of the preceding paragraph apply and whose installed capacity is 2,000 kilowatts or more, shall be subject to disciplinary actions imposed by the Electricity Industry Regulatory Agency; an operator whose installed capacity is below 2,000 kilowatts shall be subject to disciplinary actions imposed by the competent authority at the level of the Municipal Government or County (City) Government.An operator of Self-Use Power-Generation Equipment for which the violations described in Subparagraph 4, paragraph 1 of this article apply, shall be subject to disciplinary actions imposed by the competent authority at the level of the Municipal Government or County (City) Government.
中文原文 電業法第82條