Sand and Gravel Excavation Act Article 11

The sand and gravel excavation plan and drawings referred to in Subparagraph 3 of Paragraph 1 of the preceding Article shall include the following items:1. Excavation plan.2. Soil and water conservation and environmental maintenance measures.3. Site rehabilitation and maintenance measures upon depletion of sand and gravel or when the sand and gravel excavator has no intention of continuing operations.4. Transportation plan.5. Public facility maintenance plan.6. Sand and gravel excavation plan map.7. Surveyed plan drawing of the sand and gravel excavation area.8. Location and access route map of the sand and gravel excavation area.9. Other matters or documents required by the Central Competent Authority.
中文原文 土石採取法第11條
前條第一項第三款土石採取計畫書圖,應包括下列事項:
一、採取計畫。
二、水土保持及環境維護措施。
三、土石採罄或無繼續經營意願之整復維護措施。
四、運輸計畫。
五、公共設施維護計畫。
六、土石採取計畫圖。
七、土石採取區實測平面圖。
八、土石採取區位置交通圖。
九、其他中央主管機關規定應行記載事項或文件。

English translation for reference only; the Chinese text prevails. Not legal advice.