Enforcement Rules of Act for Promotion of Private Participation in Infrastructure Projects Article 43
The tasks of expropriation by zone or section specified in Paragraph 2, Article 13 of the Act that may be commissioned to private institutions shall be as follows:1. Surveys of current circumstances and cadastral measurements;2. Planning, design, construction, and management of zone/section expropriation engineering;3. Appraisal of the land with improvements and after the zone/section expropriation;4. Distribution plans and designs of the land for compensation, released to compensate for the land expropriated; and5. Compilation of relevant lists.When the authority in charge commissions the private institutions to conduct the tasks specified in the preceding paragraph, the commission contract should state the provisions governing the calculation formula, quality supervision and acceptance inspection of the zone/section expropriation engineering.
中文原文 促進民間參與公共建設法施行細則第43條
本法第十三條第二項所定得委託民間機構辦理之區段徵收開發業務如下:
一、現況調查及地籍測量。
二、區段徵收工程之規劃、設計、施工及管理。
三、土地改良物價值及區段徵收後地價之查估。
四、抵價地分配之規劃設計。
五、編造有關清冊。
主辦機關委託民間機構辦理前項業務者,應於委託契約中明定區段徵收工程之經費計算方式、品質監督及驗收等規定。
一、現況調查及地籍測量。
二、區段徵收工程之規劃、設計、施工及管理。
三、土地改良物價值及區段徵收後地價之查估。
四、抵價地分配之規劃設計。
五、編造有關清冊。
主辦機關委託民間機構辦理前項業務者,應於委託契約中明定區段徵收工程之經費計算方式、品質監督及驗收等規定。