Standards for Establishing Places for Manufacturing, Storing, Processing Public Hazardous Substances and Flammable Pressurized Gases, and Regulations on Safety Control of such Places Article 79
Before the Regulations were amended and announced on Nov. 1 2006, the places in which the facilities to manufacture, store or process public hazardous materials and inflammable pressurized gases have been installed shall submit the documentation consisting of the drawings demonstrating the location, construction and equipments and improvement program to local firefighting authority in 6 months after the date of the announcement of the Regulations, and carry out the improvement work in two years after the date of announcement according to the items to be improved listed in Attachment Table 5. Upon the deadline of completion, failure to improve and provide substantial proof that this place is an existing legal place, failure to improve within the specific deadline or failure to improve according to Attachment Table 5 is punishable as specified in Article 42.Attachment Table 5.pdf