Condominium Administration Act Building Administration Division Article 57
The builder of a condominium is required to turn over the shared areas, designated shared areas and their affiliated facilities and equipment, the instruction and maintenance manuals for the facilities and equipment and supplier information, usage license transcript, as-built drawings, plumbing and wiring charts, and machine equipment and fire safety plans 7 days after the management committee is created or the manager is elected or appointed to test and confirm the plumbing and wiring systems, machine facilities, and fire safety facilities are in normal function under the supervision of personnel from the competent authority.If the tests referred to in the preceding paragraph fail to meet the standards or the functions are apparently defective, the management committee or the manager may request the competent authority to handle and order the builder to repair and improve the defects that are attributable to the builder and repeat the handover procedure within a month.
中文原文 公寓大廈管理條例第57條
起造人應將公寓大廈共用部分、約定共用部分與其附屬設施設備;設施設備使用維護手冊及廠商資料、使用執照謄本、竣工圖說、水電、機械設施、消防及管線圖說,於管理委員會成立或管理負責人推選或指定後七日內會同政府主管機關、公寓大廈管理委員會或管理負責人現場針對水電、機械設施、消防設施及各類管線進行檢測,確認其功能正常無誤後,移交之。
前項公寓大廈之水電、機械設施、消防設施及各類管線不能通過檢測,或其功能有明顯缺陷者,管理委員會或管理負責人得報請主管機關處理,其歸責起造人者,主管機關命起造人負責修復改善,並於一個月內,起造人再會同管理委員會或管理負責人辦理移交手續。
前項公寓大廈之水電、機械設施、消防設施及各類管線不能通過檢測,或其功能有明顯缺陷者,管理委員會或管理負責人得報請主管機關處理,其歸責起造人者,主管機關命起造人負責修復改善,並於一個月內,起造人再會同管理委員會或管理負責人辦理移交手續。