Nuclear Reactor Facilities Regulation Act Article 14
During the construction or the operation period of nuclear reactor facilities, the competent authority may dispatch the inspector to inspect the facilities at any time, and may require the licensee to submit relevant materials; wherein, the licensee shall not evade, obstructs, or refuse the same. If there is anything not conform to the provision or if the public health and safety or environmental ecology may be endangered, the competent authority shall order the licensee to improve the situation or take any other necessary measures within a prescribed time period. If the situation is severe, the licensee does not improve it nor take necessary measures within the prescribed period, the competent authority may order the licensee to cease on-site working, or operation thereof, or may revoke the license or to operate only under a limited power.When making the administrative disposition according to the preceding paragraph, the competent authority shall notify the licensee by a document detailing the rationale. When the situation is urgent, the administrative disposition may be made verbally at first and the written administrative disposition shall be served supplementally upon the licensee within seven days.For the inspection referred to in Paragraph 1, the competent authority may entrust relevant authorities (institutes), schools or groups to perform; the regulations for entrusting in this context shall be prescribed by the competent authority.
中文原文 核子反應器設施管制法第14條
核子反應器設施興建或運轉期間,主管機關得隨時派員檢查,並要求經營者檢送有關資料,經營者不得規避、妨礙或拒絕。
對於不合規定或有危害公眾健康與安全或環境生態之虞者,主管機關應令其限期改善或採行其他必要措施;其情節重大、未於期限內改善或採行必要措施者,得命其停止現場作業、運轉、廢止其執照或限載運轉。
主管機關依前項規定為處分時,應以書面敘明理由,通知經營者。
但有緊急情況時,得以口頭先為處分,並於處分後七日內補行送達處分書。
第一項之檢查,主管機關得委託有關機關(構)、學校或團體辦理;其辦法,由主管機關定之。
對於不合規定或有危害公眾健康與安全或環境生態之虞者,主管機關應令其限期改善或採行其他必要措施;其情節重大、未於期限內改善或採行必要措施者,得命其停止現場作業、運轉、廢止其執照或限載運轉。
主管機關依前項規定為處分時,應以書面敘明理由,通知經營者。
但有緊急情況時,得以口頭先為處分,並於處分後七日內補行送達處分書。
第一項之檢查,主管機關得委託有關機關(構)、學校或團體辦理;其辦法,由主管機關定之。