Administrative Regulations on the Establishment and Use of Wireless Broadcasting Station for School Training Article 6
After receipt of establishment permit and frequency allocation, applicant should prepare the following documents and apply to the authority for a Station Establishment Permit issued by the authority:1. Copy of approval letter issued by the authority.2. Application Form for Station Establishment Permit .3. Station facility specification stating clearly the equipment origin factory, model, catalogue together with the system diagram such as: wireless facilities should have clear statements of electric power, station frequency, transmission method, and include information such as the antenna gain, coordinate, antenna field pattern, etc.4. Curriculum Vitae of engineering supervisor .5. When the antenna pylon is built upon rooftop of a building, an original copy of building structure safety evidence examined and issued by construction or structure engineer.The examination period for the above mentioned application is three months.
中文原文 學校實習無線廣播電臺設置使用管理辦法第6條
電臺經主管機關許可設置並指配電臺頻率後,申請人應於六個月內檢具下列文件,報請主管機關核發電臺架設許可證:
一、主管機關核准函影本。
二、電臺架設許可證申請書。
三、電臺設備說明書,其內容應載明機件出品廠名、機件型號、機件原廠型錄並附系統圖,如屬無線電設備部分應註明電功率、電臺頻率、發射方式,並附天線增益、位址座標、天線場型圖等相關資料。
四、工程主管資歷表。
五、天線之鐵塔架設於建築物屋頂者,應檢具開業建築師或與建築物結構有關之土木技師、結構技師鑑定之建築物結構安全無顧慮證明書正本。
前項申請架設許可審查期間為三個月。
一、主管機關核准函影本。
二、電臺架設許可證申請書。
三、電臺設備說明書,其內容應載明機件出品廠名、機件型號、機件原廠型錄並附系統圖,如屬無線電設備部分應註明電功率、電臺頻率、發射方式,並附天線增益、位址座標、天線場型圖等相關資料。
四、工程主管資歷表。
五、天線之鐵塔架設於建築物屋頂者,應檢具開業建築師或與建築物結構有關之土木技師、結構技師鑑定之建築物結構安全無顧慮證明書正本。
前項申請架設許可審查期間為三個月。