Regulations on Relocation Fee of Telecommunications Lines and Bearing Damage Compensation for Telecommunications Equipment Article 10
If Telecommunications lines have to relocate in coordination with conducting the roadway project, relocation fee for the related lines are conducted pursuant to the following regulations:1. When conducting the project of National Roadway, Province Highway and Municipality Express Roadway to relocate permanently the erected conduits, Telecommunications lines authorities shall pay all fees.2. If conduits that are attached on the roadway bridge in the proceeding paragraph encounter a bridge broadening or reconstruction, Telecommunications lines authorities shall operate in coordination with construction, conduct relocation and pay all fee.3. When conducing the roadway project beyond the road in Paragraph 1 to relocate permanently the erected conduits, Telecommunications lines authorities shall operate in coordination with construction, conduct relocation and pay all fee.4. When Telecommunications conduits operate in coordination with the temporary relocation of the roadway project, Roadway Construction Unit shall pay full relocation and urgent repair fee.
中文原文 電信線路遷移費用及電信設備損壞賠償負擔辦法第10條
電信線路因配合辦理道路工程而須遷移者,其相關線路遷移費用依下列規定辦理:
一、辦理國道、省道公路及直轄市所轄之快(高)速道路工程時,既有管線必須永久遷移者,應由電信線路所屬機關(構)負擔全部費用。
二、附掛於前款道路上橋樑之管線,遇有橋樑拓寬或改建,電信線路所屬機關(構)應配合施工,辦理遷移,並負擔全部費用。
三、辦理第一款道路以外之道路工程時,既有管線必須永久遷移者,電信線路所屬機關(構)應即配合施工,辦理遷移,並負擔全部遷移費用。
四、電信管線配合道路工程屬臨時遷移時,由道路施工單位全額負擔遷移、搶修費。
一、辦理國道、省道公路及直轄市所轄之快(高)速道路工程時,既有管線必須永久遷移者,應由電信線路所屬機關(構)負擔全部費用。
二、附掛於前款道路上橋樑之管線,遇有橋樑拓寬或改建,電信線路所屬機關(構)應配合施工,辦理遷移,並負擔全部費用。
三、辦理第一款道路以外之道路工程時,既有管線必須永久遷移者,電信線路所屬機關(構)應即配合施工,辦理遷移,並負擔全部遷移費用。
四、電信管線配合道路工程屬臨時遷移時,由道路施工單位全額負擔遷移、搶修費。