Regulations Governing Testing Bodies and Regulatory Certification Bodies for Controlled Telecommunications Radio-Frequency Devices Article 13
In any of the following circumstances that may occur to a test body, the competent authority may order correction by a given deadline and suspension of testing works; the testing works shall not resume until the result of correction is confirmed by the competent authority:1. Incompliance with the subparagraphs of Paragraph 2, Article 2;2. Tests performed not according to the CTRFD Regulations and CTRFD-related technical specifications;3. Refusal to provide relevant documents or refusal of field inspection by the competent authority without appropriate justification;4. Violation of CNS 17025 or ISO/IEC 17025 that is confirmed by the competent authority or AB.The suspension of testing works on the test body mentioned in the preceding paragraph shall last at least three(3)months and may be extended to a year by the competent authority depending on the severity.
中文原文 電信管制射頻器材測試機構及驗證機構管理辦法第13條
測試機構有下列情形之一者,主管機關得令其限期改善並暫停辦理測試作業,經主管機關確認改善完成,始得辦理測試作業:
一、不符合第二條第二項各款條件。
二、未依審驗辦法及電信管制射頻器材相關技術規範辦理測試作業。
三、拒不提供相關文件或無正當理由拒絕主管機關派員實地查證。
四、經主管機關或認證組織認定違反CNS17025或ISO/IEC17025標準。
前項測試機構暫停辦理測試作業之期間至少三個月,主管機關並得視情節輕重予以延長至一年。
一、不符合第二條第二項各款條件。
二、未依審驗辦法及電信管制射頻器材相關技術規範辦理測試作業。
三、拒不提供相關文件或無正當理由拒絕主管機關派員實地查證。
四、經主管機關或認證組織認定違反CNS17025或ISO/IEC17025標準。
前項測試機構暫停辦理測試作業之期間至少三個月,主管機關並得視情節輕重予以延長至一年。