Regulations for Administration of Wireless Broadband Access Business Article 36
After obtaining the installation permit and completing the changing registration for the company, the winning bidders shall apply for the permit of system installation and for the allocated frequency to the NCC with the following documents:1. Application forms of the system installation permit and the frequency allocation2. Copies of certificates of the changing registration for the company3. Documents or certificates of the confirmation to the establishment of the telecommunications supervising systems or facilities after the negotiation with the telecommunication supervising and executing authorities4. System Construction Plan: The plan includes system structure, name and quantity of the installation facility, quantity of base stations and the time schedule in the business plan for passing the system technology examination regulated in Paragraph 1 of Article 39.After licensed with the permit, the service providers shall apply for the system installation permit for the operating duration with application forms of system installation permit, certificates of confirmation to the establishment of the telecommunications supervising systems or facilities after the negotiation with the telecommunication supervising and executing authorities, and the system construction plan (including system structure, name and quantity of the installation facility, and the quantity of base stations and time schedule in the business plan for achieving the wireless wave coverage ratio regulated in Article 66.)If the required documents mentioned in the preceding two paragraphs for the application of the system installation permit are incomplete, or if the content of the required documents is incomplete or incorrect in its terms, the NCC shall give a notification and request for a remedy in a time limit. If the applicant does not make a remedy in the time limit, or if the remedied documents remain incomplete, the application shall be rejected.After the winning bidders or service providers acquire the system installation permit, they shall construct the wireless broadband access network according to the system construction plan as mentioned in point 4 of Paragraph 1 and Paragraph 2.The valid duration of the permit in the period of constructing the system is one and half year. If the construction cannot be completed in the valid period, the explanation for the incompletion shall be stated for the application for the extension. The extension shall not exceed one year and can be applied for once only. If there is any delay, the NCC can revoke the construction consent and the system installation permit and does not refund the performance bond deposit, or the NCC shall notify the guarantor bank to perform the suretyship.Extension due to the force majeure shall be allowed to be applied according to the time delayed by the force majeure without the extension restriction regulated in the preceding paragraph.If the system installation permit mentioned in the preceding two paragraphs expires, the extension of the permit for construction period shall be applied for simultaneously.The system installation permit in the preceding five paragraphs shall not exceed the valid period of the construction permit. When the winning bidders or service providers change the system construction plan mentioned in point 4 of Paragraph 1 and Paragraph 2, the explanation for the alternation shall be stated to the NCC for approval. However, the alternation shall not influence the performance bond deposit and the responsibilities mentioned in the business plan.If the winning bidders or service providers want to construct the follow-up network which is not included in the system construction plan the Paragraph 2, a list of name and quantity of system construction facilities shall be submitted for the application to the NCC for the system installation permit.Those who do not acquire the system installation permit according to these Regulations cannot establish any or the whole of the wireless broadband access network.The winning bidders or service providers shall divert the developed network of wireless broadband access experiment as one of its system network. The developed network of wireless broadband access experiment shall be established by themselves with approval or by other administrators with assignment and approval.If the bidders or service providers adopt the diversion mentioned in the preceding paragraph, the diversion shall be included in the system construction plan when applying for the system installation permit according to Paragraph 1. Or the bidders or service providers shall apply for the alteration of the system construction plan according to Paragraph 8 or shall apply for the follow-up network installation permit to the NCC according to Paragraph 9. If the facilities are located in the same places before and after the diversion, they shall be free from dismantle before acquiring the installation permit.If the subscribers who want to continue to use the original service after the diversion of the developed network of the wireless broadband access experiment, they can be the subscribers of the services when the winning bidders or service providers comply with the Regulations in Paragraph 1 of Article 12.
中文原文 無線寬頻接取業務管理規則第36條
得標者應於取得籌設許可及完成公司變更登記後,檢具下列文件,向本會申請籌設期間系統架設許可及核配頻率:
一、系統架設許可及頻率核配申請書。
二、公司變更登記文件影本。
三、與通訊監察執行機關協商確定建置通訊監察系統或設備之證明文件。
四、系統建設計畫:含系統架構、建設設備名稱及數量、依事業計畫書規劃達成第三十九條第一項所定申請系統技術審驗之基地臺數及時程。
經營者應於取得特許執照後,檢具系統架設許可申請書、與通訊監察執行機關協商確定建置通訊監察系統或設備之證明文件及系統建設計畫(含系統架構、建設設備名稱及數量、依事業計畫書規劃達成第六十六條所定電波涵蓋率之基地臺數及時程),申請營運期間系統架設許可。
前二項申請系統架設許可應具備之文件不全或其記載內容不完備或記載事項顯有誤寫者,本會應通知限期補正;逾期不補正或補正而仍不完備者,駁回其申請。
得標者或經營者取得系統架設許可後,應依第一項第四款及第二項系統建設計畫建設無線寬頻接取網路。
籌設期間系統架設許可有效期間為一年六個月;其未能於有效期間內建設完成者,應敘明理由申請展期建設,申請展期最長不得逾一年並以一次為限;逾期本會得廢止其籌設同意及系統架設許可,並不予退還履行保證金或由本會通知履約保證銀行履行保證責任。
因不可抗力事故申請展延者,得按事故延遲期間申請展延,不受前項所定展期限制。
前二項系統架設許可逾籌設許可有效期間時,應一併辦理籌設許可有效期間之展延。
第五項系統架設許可有效期間,不得逾籌設許可之有效期間;得標者或經營者變更第一項第四款及第二項系統建設計畫時,應敘明理由報請本會核准。
但其變更不得影響履行保證金及事業計畫書所載責任。
得標者或經營者建設第二項系統建設計畫以外之後續網路,應檢附系統建設設備名稱及數量清單,向本會申請系統架設許可。
未依規定取得系統架設許可者,不得設置無線寬頻接取網路之一部或全部。
得標者或經營者得將其經核准設置之無線寬頻接取實驗研發網路,或自其他無線寬頻接取實驗研發網路管理者受讓其經核准設置之無線寬頻接取實驗研發網路,移用為其系統網路之一部。
得標者或經營者擬依前項規定移用者,應於依第一項申請系統架設許可時納入其系統建設計畫,或依第八項向本會申請核准變更系統建設計畫,或依第九項向本會申請後續網路之架設許可。
其屬移用前後設置處所相同之設備者,於取得架設許可前,得免予拆除。
移用之無線寬頻接取實驗研發網路用戶擬繼續使用原服務者,得標者或經營者符合本法第十二條第一項規定時,得洽其成為本業務之用戶。
一、系統架設許可及頻率核配申請書。
二、公司變更登記文件影本。
三、與通訊監察執行機關協商確定建置通訊監察系統或設備之證明文件。
四、系統建設計畫:含系統架構、建設設備名稱及數量、依事業計畫書規劃達成第三十九條第一項所定申請系統技術審驗之基地臺數及時程。
經營者應於取得特許執照後,檢具系統架設許可申請書、與通訊監察執行機關協商確定建置通訊監察系統或設備之證明文件及系統建設計畫(含系統架構、建設設備名稱及數量、依事業計畫書規劃達成第六十六條所定電波涵蓋率之基地臺數及時程),申請營運期間系統架設許可。
前二項申請系統架設許可應具備之文件不全或其記載內容不完備或記載事項顯有誤寫者,本會應通知限期補正;逾期不補正或補正而仍不完備者,駁回其申請。
得標者或經營者取得系統架設許可後,應依第一項第四款及第二項系統建設計畫建設無線寬頻接取網路。
籌設期間系統架設許可有效期間為一年六個月;其未能於有效期間內建設完成者,應敘明理由申請展期建設,申請展期最長不得逾一年並以一次為限;逾期本會得廢止其籌設同意及系統架設許可,並不予退還履行保證金或由本會通知履約保證銀行履行保證責任。
因不可抗力事故申請展延者,得按事故延遲期間申請展延,不受前項所定展期限制。
前二項系統架設許可逾籌設許可有效期間時,應一併辦理籌設許可有效期間之展延。
第五項系統架設許可有效期間,不得逾籌設許可之有效期間;得標者或經營者變更第一項第四款及第二項系統建設計畫時,應敘明理由報請本會核准。
但其變更不得影響履行保證金及事業計畫書所載責任。
得標者或經營者建設第二項系統建設計畫以外之後續網路,應檢附系統建設設備名稱及數量清單,向本會申請系統架設許可。
未依規定取得系統架設許可者,不得設置無線寬頻接取網路之一部或全部。
得標者或經營者得將其經核准設置之無線寬頻接取實驗研發網路,或自其他無線寬頻接取實驗研發網路管理者受讓其經核准設置之無線寬頻接取實驗研發網路,移用為其系統網路之一部。
得標者或經營者擬依前項規定移用者,應於依第一項申請系統架設許可時納入其系統建設計畫,或依第八項向本會申請核准變更系統建設計畫,或依第九項向本會申請後續網路之架設許可。
其屬移用前後設置處所相同之設備者,於取得架設許可前,得免予拆除。
移用之無線寬頻接取實驗研發網路用戶擬繼續使用原服務者,得標者或經營者符合本法第十二條第一項規定時,得洽其成為本業務之用戶。