Regulations Governing Building Telecommunication Equipment Examination and Inspection Institution Article 12

If one of the following happens, NCC may terminate the contract with Inspection Institute. The pending cases of the Inspection Institute will be takeover by other Inspection Institute.1. False and wrongful examination and inspection of operation with significant consequences.2. Violation of subparagraph 1, paragraph 1 of Article 3 subparagraph 1 or 2 of Article 3.3. Violation of subparagraph 2, paragraph 1 of Article 3, requested by NCC to pause conducting examination and inspection and failed to improve within 3 months.4. Violation of article 7, warned by NCC and failed to improved within time limit.5. Violation of provision 1 or provision of article 8, warned by NCC and failed to improved within time limit.6. Violation of article 10, warned by NCC and failed to improved within time limit.7. Violation of article 10 with significant consequences.8. Other situation that leads to termination of the contract according to the entrust contract.
中文原文 建築物電信設備審查及審驗機構管理辦法第12條
審驗機構有下列各款情形之一者,本會得終止委託契約。
其未完成之審查及審驗案件,應交由本會另行指定之審驗機構辦理:
一、審查及審驗作業有虛偽不實,且情節重大者。
二、違反第三條第一項第一款規定之情事者。
三、違反第三條第一項第二款規定,經本會責令暫停辦理審查及審驗業務,且未於三個月內補實者。
四、違反第七條規定,經本會警告並限期改善仍未改善者。
五、違反第八條第一項或第二項規定,經本會警告並限期改善仍未改善者。
六、違反第十條規定,經本會警告並限期改善仍未改善者。
七、違反第十條規定情節重大者。
八、其他依委託契約約定得終止之情形者。

English translation for reference only; the Chinese text prevails. Not legal advice.