Regulations for Administration of Mobile Broadband Businesses Article 43

The nominated bidder shall, upon securing the launching consent letter and completing the company modification registration, submit the following documents to apply with competent authority for a system installation permit:1.The frequency assignment approval letter and the system installation permit applicant form.2.Photocopy of the company modification registration document.3.Proof of documentation on launching a communications surveillance system or equipment negotiated and confirmed with competent communications surveillance enforcement agency.4.System construction plan: (1)System framework, and brand, model, quantity, function and capacity of construction equipment.(2)The number of base stationsand the schedule for reaching the coverage of the radio waves specified in Article 66.(3)The system equipment complying with the information and communications security regulations issued by the ITU or 3GPP.(4)The brand, model, quantity, function and capacity of the protection facilities for information and communications securityIn the event where the mandated documents applying for the system installation permit should be deemed incomplete, or the content of the entry should be deemed incomplete, orthe entries should contain erroneous entries, the competent authority shall notify the bidder to adopt retroactive correction within a prescribed deadline; when failing to adopt retroactive correction exceeding the deadline or the retroactive correction should be deemed incomplete, the application shall be declined.The nominated bidder that has been the incumbent operator shall submit the documents per Subparagraph 1, 3 and 4 of Paragraph 1 to apply for system installation permit.The nominated bidder shall, upon obtaining the system installation permit, develop the mobile broadband system in accordance with the system development plan specified under Subparagraph 4 of Paragraph 1.The nominated bidder or the operator, when modifying the system launching plan in accordance with Subparagraph 4 of Paragraph 1, shall state the reason why and voluntarily declare it with the competent authority for approval.The nominated bidder or the operator, when developing the subsequent network beyond that described in thesystem development plan in accordance with Subparagraph 4 of Paragraph 1, shall submit a system development equipment description and quantity checklist to apply with the competent authority for a system installation permit.The nominated bidder or the operator shall construct a mobile broadband system in accordance with the provisions of Articles 47 and 66, and construct its system by mobile communication technologies approved and announced by ITU, 3GPP or the competent authority.The bidder, when failingto obtain a permit to begin operations or failing to obtain an approval, may not install the entire or a portion of the mobile broadband system.The competent authority shall consult with relevant government entities in consideration of national security when approving or revoking a system development plan.
中文原文 行動寬頻業務管理規則第43條
得標者應於取得籌設同意書及完成公司變更登記後,檢具下列文件,向主管機關申請系統架設許可:
一、頻率指配核准函及系統架設許可申請書。
二、公司變更登記文件影本。
三、與通訊監察執行機關協商確定建置通訊監察系統或設備之證明文件。
四、系統建設計畫:
(一)系統架構、建設設備之廠牌、型號、數量、功能及容量。
(二)達成第六十六條所定電波涵蓋範圍之基地臺數及時程。
(三)系統設備符合ITU或3GPP發布之資通安全規定。
(四)資通安全防護設施之廠牌、型號、數量、功能及容量。
前項申請系統架設許可應具備之文件不全或其記載內容不完備或記載事項誤寫者,主管機關應通知限期補正;逾期不補正或補正而仍不完備者,不予受理。
第一項已為經營者之得標者應檢具第一項第一款、第三款及第四款文件,向主管機關申請系統架設許可。
得標者取得系統架設許可後,應依第一項第四款系統建設計畫建設行動寬頻系統。
得標者或經營者變更第一項第四款系統建設計畫時,應敘明理由報請主管機關核准。
得標者或經營者建設第一項第四款系統建設計畫以外之後續網路,應檢附系統建設設備名稱及數量清單向主管機關申請系統架設許可。
得標者或經營者應依第四十七條、第六十六條規定建設行動寬頻系統,並得以ITU、3GPP或其他經主管機關核定公告之行動通訊技術,建設其系統。
未依規定取得架設許可或未經核准者,不得設置行動寬頻系統之一部或全部。
主管機關就系統建設計畫為准駁決定時,應配合有關機關之國家安全考量辦理。

English translation for reference only; the Chinese text prevails. Not legal advice.