Regulations for Administration of Base Stations of Mobile Communications Network Businesses Article 4

A winning bidder or a service provider shall not install any base station without an installation permit and shall not utilize it without a radio station license before examinations to be qualified. However, the winning bidder or the service provider can install a base station before acquiring the installation permit exclusively for the purpose of coordinating with the establishment of Important Public Construction after submitting the consent documents issued by the authorities of the Important Public Construction or Buildings to the NCC and obtain the special case approval from the NCC.The winning bidder or the service provider may divert their own approved experimental mobile businesses network base stations, or approved experimental base stations transferred from other experimental mobile network administrators as a part of their own network system. The diverted facilities on the same site may not be demolished.Once the winning bidder or the service provider has been approved to divert its own base stations, or those transferred from other mobile business service providers as part of its own network, a copy of the approval letter issued by the NCC, as well as the affidavit for the installation of the base station referred to in Subparagraph 2, Paragraph 1 of Article 5, shall be submitted. The diversion shall accord with the following procedures:1. For the diversion of a base station with an installation permit prior to obtaining a radio station license, the installation permit should be submitted to be changed, and the valid period of the installation permit shall be renewed.2. For the diversion of a base station with radio station license, the radio station license shall be submitted to be changed; the station shall be exempt from examination, and the valid period of radio station license will be renewed.
中文原文 行動通信網路業務基地臺設置使用管理辦法第4條
得標者或經營者非經取得電臺架設許可,不得設置基地臺,非經審驗合格發給電臺執照,不得使用。
但為配合重大公共工程之建設,檢具重大公共工程或建物主管機關(構)書面同意函,經主管機關專案核准後,於取得架設許可前,得先行設置。
得標者或經營者得將其經核准設置之行動業務實驗研發網路所用之基地臺,或自其他行動業務實驗研發網路管理者受讓其經核准設置之行動業務實驗研發網路所用之基地臺,移用為其系統網路之一部。
其屬移用前後設置處所相同之設備者,於取得架設許可前,得免予拆除。
得標者或經營者如經主管機關核准將其自身或其他行動業務經營者之基地臺移用為其系統網路之一部,應檢附主管機關核准函影本及第五條第一項第二款之電臺架設切結書,依下列方式辦理:
一、移用前具架設許可者,申請換發架設許可,架設許可效期重新計算;
二、移用前具電臺執照者,申請換發電臺執照,得免基地臺審驗,電臺執照效期重新計算。

English translation for reference only; the Chinese text prevails. Not legal advice.