Rules for the Technical Engineering of Cable Radio and Television Systems Article 41
System operators should establish a system maintenance work diary and work record.The work diary should record the following items:1. Name and time of working staff in shift2. Condition of breakdown and its repair time3. Power cut-off and the time taken to resume power supply and the conditions of using self-provided power generator4. Other technical engineering related itemsWork record should record the following items in different sections1. Record of wave leakage testing2. Record of ground test meter resistance testing3. Record of signal quality testing4. Record of testing device correction5. Record of service maintenance on signal processing device6. Record of self-provided power generator service and maintenance7. Record of breakdown maintenance (including average repair time)The work diary and work record should be signed and inspected by the engineering supervisor, its format can be set by the system operators themselves, and preservation period is one year.
中文原文 有線廣播電視系統工程技術管理辦法第41條
系統經營者應設置系統維護工作日誌及工作紀錄簿。
工作日誌應記載下列事項:
一、輪值工作人員姓名及時間。
二、故障發生情形及其修復時間。
三、電源中斷與恢復供電時間及使用自備發電機情形。
四、其他有關工程技術事項。
工作紀錄簿應分冊記載下列事項:
一、電波洩漏測試紀錄。
二、接地電阻測試紀錄。
三、信號品質測試紀錄。
四、測試設備校正紀錄。
五、信號處理設備保養維護紀錄。
六、自備發電機保養維護紀錄。
七、故障修護紀錄(含平均修護時間)。
工作日誌及工作紀錄簿須經工程主管簽核,其格式由各系統經營者自行訂定,保存期間為一年。
工作日誌應記載下列事項:
一、輪值工作人員姓名及時間。
二、故障發生情形及其修復時間。
三、電源中斷與恢復供電時間及使用自備發電機情形。
四、其他有關工程技術事項。
工作紀錄簿應分冊記載下列事項:
一、電波洩漏測試紀錄。
二、接地電阻測試紀錄。
三、信號品質測試紀錄。
四、測試設備校正紀錄。
五、信號處理設備保養維護紀錄。
六、自備發電機保養維護紀錄。
七、故障修護紀錄(含平均修護時間)。
工作日誌及工作紀錄簿須經工程主管簽核,其格式由各系統經營者自行訂定,保存期間為一年。