Standards for Determining Specific Items and Scope of Environmental Impact Assessments for Development Activities. Article 6
Where one of the following circumstances applies with respect to the development of a railway, an environmental impact assessment shall be required:I. The construction, widening or extension of a high-speed railway.II. The construction or extension of a railway other than a high-speed railway, and one of the following conditions applies:A. The site is located in a national park.B. The site is located in a wildlife refuge or a major wildlife habitat.C. The site is located in an important wetland.D. The site is located in a nature preserve approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan.E. The site is located in a reservoir watershed.F. The site is located at an elevation of over 1,500 meters.G. The site is located in a slopeland, a general protected area approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan, urban land or non-urban land and the total length of an associated tunnel or underground roadway project is one kilometer or more.H. The length is 5 kilometers or more.III. Widening of a railway that is not a high-speed railway, and one of the following conditions applies:A. The site is located in a national park and the length is 2.5 kilometers or moreB. The site is located in a wildlife refuge or a major wildlife habitat, and the length is one kilometer or more.C. The site is located in an important wetland and the length is one kilometer or more.D. The site is located in a nature preserve approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan and the length is one kilometer or more.E. The site is located in a reservoir watershed and the length is one kilometer or more.F. The site is located at an elevation of over 1,500 meters.G. The site is located in a slopeland, a general protected area approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan, urban land or non-urban land and the total length of an associated tunnel or underground roadway project is one kilometer or more.H. The length is 5 kilometers or more.IV. The project consists of reconstructing or widening an existing railway viaduct, bridge, or elevated intersection, connects with an existing railway, and one of the following conditions applies:A. The site is located in a national park and the length is 2.5 kilometers or more.B. The site is located in a wildlife refuge, a major wildlife habitat, an important wetland, a nature preserve approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan, or a reservoir watershed, and the length is 500 meters or moreC. The site is located at an elevation of over 1,500 meters.D. The length is 5 kilometers or more.V. A railway depot or switching yard construction or expansion, and one of the following conditions applies:A. The site is located in a national park. However, this restriction shall not apply when the expansion application for development area or cumulative development area is less than 1,000 square meters, and the national park competent authority and industry competent authority have granted their consent.B. The site is located in a wildlife refuge or a major wildlife habitat. However, this restriction shall not apply when the site is located in a major wildlife habitat, the expansion application for development area or cumulative development area is less than 1,000 square meters, and the competent authority in charge of the major wildlife habitat and the industry competent authority have granted their consent.C. The site is located in an important wetland.D. The site is located in a nature preserve approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan.E. The site is located in a reservoir watershed. However, this restriction shall not apply when the expansion application for development area or cumulative development area is less than 1,000 square meters, and the reservoir competent authority and industry competent authority have granted their consent.F. The site is located in a water quality and quantity protection area. However, this restriction shall not apply when the expansion application for development area or cumulative development area is less than 1,000 square meters, and the water quality and quantity protection area competent authority and industry competent authority have granted their consent.G. The site is located at an elevation of over 1,500 meters.H. The site is located in a slopeland or a general protected area approved and announced under the Taiwan Coastal Area Natural Environment Protection Plan, and the application for development area or cumulative development area is one hectare or more.I. The site is located in an agricultural land in a special agricultural zone, and the application for development area or cumulative development area is one hectare or more.J. The site is located on urban land, and the application for development area or cumulative development area is 5 hectares or more.K. The site is located on non-urban land, and the application for development area or cumulative development area is 10 hectares or more.In Subparagraph 2 or 3 of the foregoing paragraph, the length shall be calculated including the combined length of viaducts, bridges, elevated intersections, tunnels, underground roadways, and approach roads.In Paragraph 1, Subparagraph 4, when the viaducts, bridges, or elevated intersections are elevated structures, the length of the approach roads shall be combined with that of the viaducts, bridges, or elevated intersections in length calculations.
中文原文 開發行為應實施環境影響評估細目及範圍認定標準第6條
鐵路之開發,有下列情形之一者,應實施環境影響評估:
一、高速鐵路興建、拓寬或延伸工程。
二、高速鐵路以外之鐵路興建或延伸工程,符合下列規定之一者:
(一)位於國家公園。
(二)位於野生動物保護區或野生動物重要棲息環境。
(三)位於重要濕地。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區。
(五)位於水庫集水區。
(六)位於海拔高度一千五百公尺以上。
(七)位於山坡地、臺灣沿海地區自然環境保護計畫核定公告之一般保護區、都市土地或非都市土地,其附屬隧道或地下化工程長度合計一公里以上。
(八)長度五公里以上。
三、高速鐵路以外之鐵路拓寬,符合下列規定之一者:
(一)位於國家公園,長度二.五公里以上。
(二)位於野生動物保護區或野生動物重要棲息環境,長度一公里以上。
(三)位於重要濕地,長度一公里以上。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區,長度一公里以上。
(五)位於水庫集水區,長度一公里以上。
(六)位於海拔高度一千五百公尺以上。
(七)位於山坡地、臺灣沿海地區自然環境保護計畫核定公告之一般保護區、都市土地或非都市土地,其附屬隧道或地下化工程長度合計一公里以上。
(八)長度五公里以上。
四、既有鐵路高架路橋、橋梁或立體交叉工程之重建或拓寬,並銜接既有鐵路,符合下列規定之一者:
(一)位於國家公園,長度二.五公里以上。
(二)位於野生動物保護區、野生動物重要棲息環境、重要濕地、臺灣沿海地區自然環境保護計畫核定公告之自然保護區或水庫集水區,長度五百公尺以上。
(三)位於海拔高度一千五百公尺以上。
(四)長度五公里以上。
五、鐵路機車場、調車場興建或擴建,符合下列規定之一者:
(一)位於國家公園。
但申請擴建或累積擴建面積一千平方公尺以下,經國家公園主管機關及目的事業主管機關同意者,不在此限。
(二)位於野生動物保護區或野生動物重要棲息環境。
但位於野生動物重要棲息環境,申請擴建或累積擴建面積一千平方公尺以下,經野生動物重要棲息環境主管機關及目的事業主管機關同意者,不在此限。
(三)位於重要濕地。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區。
(五)位於水庫集水區。
但申請擴建或累積擴建面積一千平方公尺以下,經水庫主管機關及目的事業主管機關同意者,不在此限。
(六)位於自來水水質水量保護區。
但申請擴建或累積擴建面積一千平方公尺以下,經自來水水質水量保護區主管機關及目的事業主管機關同意者,不在此限。
(七)位於海拔高度一千五百公尺以上。
(八)位於山坡地或臺灣沿海地區自然環境保護計畫核定公告之一般保護區,申請開發或累積開發面積一公頃以上。
(九)位於特定農業區之農業用地,申請開發或累積開發面積一公頃以上。
(十)位於都市土地,申請開發或累積開發面積五公頃以上。
(十一)位於非都市土地,申請開發或累積開發面積十公頃以上。
前項第二款或第三款所定長度,應將高架路橋、橋梁、立體交叉工程、隧道、地下化工程或引道之長度,合併計算。
第一項第四款所定高架路橋、橋梁或立體交叉工程,其引道以高架方式興建者,應將引道之長度,納入高架路橋、橋梁或立體交叉工程之長度合併計算。
一、高速鐵路興建、拓寬或延伸工程。
二、高速鐵路以外之鐵路興建或延伸工程,符合下列規定之一者:
(一)位於國家公園。
(二)位於野生動物保護區或野生動物重要棲息環境。
(三)位於重要濕地。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區。
(五)位於水庫集水區。
(六)位於海拔高度一千五百公尺以上。
(七)位於山坡地、臺灣沿海地區自然環境保護計畫核定公告之一般保護區、都市土地或非都市土地,其附屬隧道或地下化工程長度合計一公里以上。
(八)長度五公里以上。
三、高速鐵路以外之鐵路拓寬,符合下列規定之一者:
(一)位於國家公園,長度二.五公里以上。
(二)位於野生動物保護區或野生動物重要棲息環境,長度一公里以上。
(三)位於重要濕地,長度一公里以上。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區,長度一公里以上。
(五)位於水庫集水區,長度一公里以上。
(六)位於海拔高度一千五百公尺以上。
(七)位於山坡地、臺灣沿海地區自然環境保護計畫核定公告之一般保護區、都市土地或非都市土地,其附屬隧道或地下化工程長度合計一公里以上。
(八)長度五公里以上。
四、既有鐵路高架路橋、橋梁或立體交叉工程之重建或拓寬,並銜接既有鐵路,符合下列規定之一者:
(一)位於國家公園,長度二.五公里以上。
(二)位於野生動物保護區、野生動物重要棲息環境、重要濕地、臺灣沿海地區自然環境保護計畫核定公告之自然保護區或水庫集水區,長度五百公尺以上。
(三)位於海拔高度一千五百公尺以上。
(四)長度五公里以上。
五、鐵路機車場、調車場興建或擴建,符合下列規定之一者:
(一)位於國家公園。
但申請擴建或累積擴建面積一千平方公尺以下,經國家公園主管機關及目的事業主管機關同意者,不在此限。
(二)位於野生動物保護區或野生動物重要棲息環境。
但位於野生動物重要棲息環境,申請擴建或累積擴建面積一千平方公尺以下,經野生動物重要棲息環境主管機關及目的事業主管機關同意者,不在此限。
(三)位於重要濕地。
(四)位於臺灣沿海地區自然環境保護計畫核定公告之自然保護區。
(五)位於水庫集水區。
但申請擴建或累積擴建面積一千平方公尺以下,經水庫主管機關及目的事業主管機關同意者,不在此限。
(六)位於自來水水質水量保護區。
但申請擴建或累積擴建面積一千平方公尺以下,經自來水水質水量保護區主管機關及目的事業主管機關同意者,不在此限。
(七)位於海拔高度一千五百公尺以上。
(八)位於山坡地或臺灣沿海地區自然環境保護計畫核定公告之一般保護區,申請開發或累積開發面積一公頃以上。
(九)位於特定農業區之農業用地,申請開發或累積開發面積一公頃以上。
(十)位於都市土地,申請開發或累積開發面積五公頃以上。
(十一)位於非都市土地,申請開發或累積開發面積十公頃以上。
前項第二款或第三款所定長度,應將高架路橋、橋梁、立體交叉工程、隧道、地下化工程或引道之長度,合併計算。
第一項第四款所定高架路橋、橋梁或立體交叉工程,其引道以高架方式興建者,應將引道之長度,納入高架路橋、橋梁或立體交叉工程之長度合併計算。