Drinking Water Quality Standards Article 3-1
The standards for Per- and Polyfluoroalkyl Substances (PFAS) are as follows:The water supply entities or management entities of water purification equipment shall, from January 1, 2025, until the effective date mentioned in the preceding paragraph, conduct water quality testing as follows: for equipment with a water supply exceeding 20,000 cubic meters per day, testing shall be performed at least twice, with a minimum interval of 360 days between tests. For equipment with daily water supply below 20,000 cubic meters, at least one test shall be conducted. If any water quality parameter exceeds the maximum limit, the water supply or management entities of the water purification equipment must, within seven days of the issuance of the test report, notify the central competent authority, the central competent authority under the Water Supply Act, and the competent authority of the municipality or county (city) where the equipment is located. Additionally, within 30 days, they must submit a drinking water quality management plan to the central competent authority for record-keeping and send a copy to the central competent authority under the Water Supply Act and the competent authority of the municipality or county (city) where the equipment is located.If, before the effective date mentioned in the preceding paragraph, the competent authority conducts random water quality inspections and finds that the drinking water quality test values exceed the maximum limit, the competent authority shall notify the water supply or management entities of the water purification equipment to make improvements. The water supply or management entities must, within 30 days after receiving the notification, submit a drinking water quality management plan to the central competent authority for record-keeping and send a copy to the central competent authority under the Water Supply Act and the competent authority of the municipality or county (city) where the equipment is located.For the drinking water quality management plan outlined in the previous two paragraphs, if no additional equipment purchases or construction work are involved, the implementation must be completed within three months from the submission date of the plan to the central competent authority for record-keeping. If additional equipment purchases or construction work are required, which must be completed within a maximum of two years from the submission date of the drinking water quality management plan. If the plan cannot be completed within the stipulated timeframe due to natural disasters or other force majeure events, the relevant supporting documents and materials must be submitted to the central competent authority at least 30 days before the deadline to apply for an extension or modification of the management plan for re-approval. Copies of the request should also be sent to the central competent authority under the Water Supply Act, as well as to the competent authority of the municipality or county (city) where the water purification equipment is located.The implementation deadlines for the previous three drinking water quality management plans shall not exceed the effective date specified in paragraph 1.Article 3-1.pdf
中文原文 飲用水水質標準第3-1條
(因條文排版無法完整呈現內容,請詳閱完整條文檔案)全氟及多氟烷基物質標準規定如下:淨水處理設備供水單位或管理單位自中華民國一百十四年一月一日起至前項施行日期前,淨水處理設備每日供水量達二萬立方公尺以上者,應至少檢測二次,且二次檢測日間隔應至少超過三百六十日;淨水處理設備每日供水量未達二萬立方公尺者,應至少檢測一次;經檢驗其水質任一項目超過最大限值時,該淨水處理設備供水單位或管理單位應於出具檢測報告日起七日內通報中央主管機關、自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關,並於三十日內提出飲用水水質管理計畫送中央主管機關備查,並副知自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關。
主管機關於第一項施行日期前抽驗飲用水水質檢測值超過最大限值者,應通知淨水處理設備供水單位或管理單位改善,該供水或管理單位應於通知函送達之日起三十日內提出飲用水水質管理計畫送中央主管機關備查,並副知自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關。
前二項飲用水水質管理計畫未涉增購設備或工程施作者,應於飲用水水質管理計畫送達之日起三個月內執行完成;涉及增購設備或工程施作者,至遲應於飲用水水質管理計畫送達之日起二年內完成;提送飲用水水質管理計畫備查後,因天災或其他不可抗力事由,致不能於規定期限內完成者,應於期限屆滿前三十日內,檢具證明文件及相關資料,送中央主管機關申請展延或變更管理計畫重新備查,並副知自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關。
前三項飲用水水質管理計畫之執行期限,不得逾第一項施行日期。
主管機關於第一項施行日期前抽驗飲用水水質檢測值超過最大限值者,應通知淨水處理設備供水單位或管理單位改善,該供水或管理單位應於通知函送達之日起三十日內提出飲用水水質管理計畫送中央主管機關備查,並副知自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關。
前二項飲用水水質管理計畫未涉增購設備或工程施作者,應於飲用水水質管理計畫送達之日起三個月內執行完成;涉及增購設備或工程施作者,至遲應於飲用水水質管理計畫送達之日起二年內完成;提送飲用水水質管理計畫備查後,因天災或其他不可抗力事由,致不能於規定期限內完成者,應於期限屆滿前三十日內,檢具證明文件及相關資料,送中央主管機關申請展延或變更管理計畫重新備查,並副知自來水法中央主管機關及淨水處理設備所在地直轄市、縣(市)主管機關。
前三項飲用水水質管理計畫之執行期限,不得逾第一項施行日期。