Water Pollution Control Measures and Test Reporting Management Regulations Article 49-3
In the event that, during the construction, sludge deposits clearly visible have been formed at the bottom of pipelines in the surrounding ditches, the entry point of the water body, and its surrounding areas at the construction site, the owner shall remove the sludge deposits on its own initiative or within three days pursuant to the order of the competent authority.The owner shall use appropriate storage equipment to collect and treat the waste oil, lubricant, and diesel fuel left or spilled from construction machinery and vehicle servicing and/or maintenance, and shall not discharge or have them spill over into the place outside the work environment along with the wastewater or sewage or runoff wastewater.For the removal of sludge deposits and the collection and treatment of waste fuel and oil referred to in the preceding two paragraphs, the owner shall record the time and method for each removal, collection and treatment, and the record as well as the certificate of appropriate treatment shall be retained for reference until the construction is completed and the control under the Act is removed by the municipality or county (city) competent authority.
中文原文 水污染防治措施及檢測申報管理辦法第49-3條
營建工地施工期間,於其周圍排水溝排放管線底部、進入水體處及其周圍環境,形成可見之沉積污泥時,營建業主應予以清除,或依主管機關之命令,於三天內清除。
施工機具、車輛維修、保養所棄置或溢洩之廢機油、潤滑油、柴油等,營建業主應以適當之儲存設備收集處理,不得隨廢(污)水或逕流廢水排放或溢流於作業環境外。
前二項沉積污泥之清除、廢油之收集處理,營建業主應每次記錄清除、收集處理時間及方法,其紀錄及妥善處理證明文件,應保存至營建工地完工,且經直轄市、縣(市)主管機關解除本法管制,以備查閱。
施工機具、車輛維修、保養所棄置或溢洩之廢機油、潤滑油、柴油等,營建業主應以適當之儲存設備收集處理,不得隨廢(污)水或逕流廢水排放或溢流於作業環境外。
前二項沉積污泥之清除、廢油之收集處理,營建業主應每次記錄清除、收集處理時間及方法,其紀錄及妥善處理證明文件,應保存至營建工地完工,且經直轄市、縣(市)主管機關解除本法管制,以備查閱。