Water Pollution Control Act Article 17
With the exception of those connected to a sewage system, when an enterprise submits a water pollution control measure plan pursuant to Article 13 and, pursuant to Article 14, applies for the issuance of a discharge permit and performs the modification of registration, the necessary documents the enterprise is required to possess shall be signed by a legally registered and practicing environmental engineer or other relevant professional engineer.Those that meet one of the following circumstances may be exempt from obtaining the additional signature of an engineer pursuant to the foregoing paragraph.I. Those circumstances in which the items that require the signature of an engineer for a water pollution control measure plan that is required to be submitted when applying for a discharge permit pursuant to Article 14 and for a water pollution control measure plan that has been previously reviewed and approved pursuant to Article 13 have not been modified.II. Those circumstances in which the items that require the signature of an engineer when applying for the extension of a discharge permit pursuant to Article 15 have not been modified.Those within government agencies, public enterprises or organizations and public juridical persons subject to Paragraph 1 that have legally obtained certification as an engineer in Paragraph 1 may perform the signature work.The central competent authority shall determine the items to be checked when an engineer performs the signature work in Paragraph 1.
中文原文 水污染防治法第17條