Management Regulations for Construction Project Air Pollution Control Facilities Article 8

During construction project periods, construction project owners should cover vehicle routes with one of the following control installations to effectively suppress dust raised by vehicles within the construction site:I. Steel platesII. ConcreteIII. Asphalt concreteIV. Coarse grade mixture or granular materialsThe control installations in the foregoing paragraph shall cover more than 70 percent of the vehicle route surface area. For Type 1 construction projects, control installations shall cover 90 percent or more of the vehicle route surface area.Vehicle routes from carwash facilities to major roads shall comply with the regulations of paragraph 1.
中文原文 營建工程空氣污染防制設施管理辦法第8條
營建業主於營建工程進行期間,應於營建工地內之車行路徑,舖設下列有效抑制粉塵之防制設施之一:
一、鋼板。
二、混凝土。
三、瀝青混凝土。
四、粗級配或粒料。
前項防制設施須達車行路徑面積之百分之七十以上;屬第一級營建工程者,須達車行路徑面積之百分之九十以上。
洗車設施至主要道路之車行路徑,應符合第一項之規定。

English translation for reference only; the Chinese text prevails. Not legal advice.