Stationary Pollution Source Installation, Operating and Fuel Use Permit Management Regulations Amended Clauses Article 41

When the public or private premises perform trial operation or testing in accordance with Article 20, the following principles shall apply to the operating permits approved by the reviewing agency and the operating conditions related to air pollutant emission:I.If the main raw materials and fuel usage quantity reaches 80% or more of the application, the approved contents for the operating permit shall be based on the contents of the application.II.If the main raw materials and fuel usage quantity cannot reach 80% of the application, the approved contents for the operating permit shall be 1.2 times the actual operating conditions during trial operation or testing.
中文原文 固定污染源設置操作及燃料使用許可證管理辦法第41條
公私場所依第二十條規定進行試車或檢測時,審核機關核定操作許可證與空氣污染物排放有關之操作條件,應依下列原則辦理:
一、主要原(物)料及燃料使用量達申請之百分之八十以上者,應依申請內容作為操作許可證之核定內容。
二、主要原(物)料及燃料使用量無法達申請之百分之八十以上者,應以試車或檢測時之實際操作條件之一.二倍,作為操作許可證之核定內容。

English translation for reference only; the Chinese text prevails. Not legal advice.