Enforcement Rules of Soil and water Conservation Act Article 4

The scope of soil and water conservation treatment and maintenance designated by the central level responsible authority pursuant to Article 6 of the Act, or above, is as follows:1. Treatment, operation or utilization under Subparagraphs 1, 6 to 8, Paragraph 1, Article 8 of the Act: the cost of soil and water conservation treatment and maintenance totals NT 20 million dollars or above.2. The utilization behavior matches the Paragraph 1, Article 12 of the Act (requiring a soil and water conservation plan), but does not include that of the Paragraph 4, Article 12 (requiring a simplified soil and water conservation statement).3. Treatment, operation or utilization under Subparagraphs 9, Paragraph 1, Article 8 of the Act: the area of excavation and soil preparation is at least 2,000m2, or the total area being excavated and filled is at least 5,000m3.The special municipality or county/city regulatory authority may, subject to the special features or requirements of the environment of the relevant area under its control, draft stricter conditions than those described in the preceding paragraph, submit the draft to the central regulatory authority for approval, and enforce the approved conditions upon such approval.
中文原文 水土保持法施行細則第4條
本法第六條所定水土保持之處理與維護在中央主管機關指定規模以上者,其規模如下:
一、本法第八條第一項第一款、第六款至第八款所定之治理或經營、使用行為:其水土保持之處理與維護費用在新臺幣二千萬元以上。
二、本法第八條第一項第二款至第五款所定之治理或經營、使用行為:符合本法第十二條第一項應擬具水土保持計畫之行為,其種類及規模非屬同條第四項得以簡易水土保持申報書代替者。
三、本法第八條第一項第九款所定之治理或經營、使用行為:其開挖整地面積在二千平方公尺以上或挖填土石方之挖方及填方加計總和在五千立方公尺以上。
直轄市或縣(市)主管機關得視轄區環境特性或需要,擬訂較前項嚴格之條件,報請中央主管機關核定後實施。

English translation for reference only; the Chinese text prevails. Not legal advice.